== Yocto Project Weekly Status April 23rd, 2024 ==
== Yocto Project Weekly Status May 7th, 2024 ==
Current Dev Position: YP 5.0 in QA <br/>
Current Dev Position: YP 5.1 M1 <br/>
Next Deadline: YP 5.0 Release by 30 April 2024<br/>
Next Deadline: YP 5.1 M1 Build 20 May 2024<br/>


'''Next Team Meetings:'''<br/>
'''Next Team Meetings:'''<br/>
*Bug Triage meeting Thursday April 25th at 7:30 am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Bug Triage meeting Thursday May 9th at 7:30 am PDT (https://zoom.us/j/454367603?pwd=ZGxoa2ZXL3FkM3Y0bFd5aVpHVVZ6dz09)
*Weekly Engineering Sync Tuesday April 23rd at 8 am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Weekly Engineering Sync Tuesday May 7th at 8 am PDT (https://zoom.us/j/990892712?pwd=cHU1MjhoM2x6ck81bkcrYjRrcmJsUT09)
*Twitch -  See https://www.twitch.tv/theyoctojester
*Twitch -  See https://www.twitch.tv/theyoctojester


'''Key Status/Updates:'''<br/>
'''Key Status/Updates:'''<br/>
*YP 5.0 rc4 is in QA.
*YP 3.1.33 has been released
*YP 3.1.33, The final dunfell build will follow 5.0 into QA.
*YP 4.0.18 is due to be released
*YP 4.0.18 is behind 3.1.33 for QA.
*There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990 Please consider signing this to show support for those changes. Signatures from small businesses/consultancies are as welcome as those from larger organizations as we want to demonstrate the breadth of the need for these changes.
*YP 5.0 rc2 was abandoned after issues with git in buildtools were found caused by a curl regression. 5.0 rc3 had further buildtools issues from configuration problems. 5.0 rc4 was built cleanly and went into QA to replace rc2.
*The master branch has diverged from scarthgap and we’re trying to keep up to date with incoming patches there.
*There are also patches under review for the patch/cve metrics page to improve the usability as well as build performance graphing improvements.
*There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990
Please consider signing this to show support for those changes, which would improve our ability to analyze CVEs, and that of many other projects (including other distros) to do so too.
*We continue to watch the NIST NVD (CVE database) situation, the lack of CPE information is problematic for us and we are considering what alternatives we have.
*Some CVE information is being provided for issues in meta-openembedded, this has been provided with help from the Sovereign Tech Fund.
*The project is sponsoring Syslinbit to separate out our CVE tooling from the build system into a standalone tool so that it can be used on software manifests of output at a later date.  
*The project is sponsoring Syslinbit to separate out our CVE tooling from the build system into a standalone tool so that it can be used on software manifests of output at a later date.  
*There are proposals on the openembedded-architecture list to rework how do_unpack works, switching it from WORKDIR to a new variable and changing some directory layout.
*The introduction of UNPACKDIR has happened, maintainers should be able to improve their S=WORKDIR recipes (which should use S, not WORKDIR/UNPACKDIR) and fix the common use of WORKDIR in do_compile/do_install to access files from SRC_URI which should now be UNPACKDIR.
*gcc 14 has patches pending thanks for Khem and Martin in particular. Merging the new gcc version is needed to generate new uninative tarballs to support Fedora 40 builds or any other distro using the new gcc version.
*The project is in the process of testing a new way of hosting our autobuilder with plans to switch soon if successful. Our existing hardware is past end of life and showing increased hardware failures so is currently down on capacity meaning builds are taking longer than normal.
*Mailing list changes now mean any google hosted email accounts have the mailing list From: address rewritten. This had impacted our ability to handle patches but key maintainers now have workarounds for this.


'''Ways to contribute:'''<br/>
'''Ways to contribute:'''<br/>
Line 30: Line 28:
*We have a growing number of bugs in bugzilla, any help with them is appreciated.
*We have a growing number of bugs in bugzilla, any help with them is appreciated.


'''YP 5.0 Milestone Dates:'''<br/>
'''Tracking Metrics:'''<br/>
*YP 5.0 is in QA
*WDD 2720 (last week 2728) (https://wiki.yoctoproject.org/charts/combo.html)
*YP 5.0 M4 Release date 2024/04/30
*OE-Core/Poky Patch Metrics
**Total patches found: 1125 (last week 1125)
**Patches in the Pending State: 221 (20%) [last week 221 (20%)]
*https://autobuilder.yocto.io/pub/non-release/patchmetrics/


'''YP 5.1 Milestone Dates:'''<br/>
'''YP 5.1 Milestone Dates:'''<br/>
Line 45: Line 46:


'''Upcoming dot releases:'''<br/>
'''Upcoming dot releases:'''<br/>
*YP 3.1.33 is in QA
*YP 3.1.33 is released.
*YP 4.0.18 is in QA
*YP 4.0.18 is ready for release.
*YP 4.0.18 Release date 2024-05-03
*YP 4.0.18 Release date 2024-05-03
*YP 5.0.1 Build Date 2024-05-13
*YP 5.0.1 Build Date 2024-05-13
Line 68: Line 69:
*YP 4.0.23 Build Date 2024-11-18
*YP 4.0.23 Build Date 2024-11-18
*YP 4.0.23 Release Date 2024-11-29
*YP 4.0.23 Release Date 2024-11-29
'''Tracking Metrics:'''<br/>
*WDD 2714 (last week 2719) (https://wiki.yoctoproject.org/charts/combo.html)
*OE-Core/Poky Patch Metrics
**Total patches found: 1140 (last week 1173)
**Patches in the Pending State: 249 (21%) [last week 249 (21%)]
*https://autobuilder.yocto.io/pub/non-release/patchmetrics/


'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>
'''The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:'''<br/>

Latest revision as of 14:44, 7 May 2024

Yocto Project Weekly Status May 7th, 2024

Current Dev Position: YP 5.1 M1
Next Deadline: YP 5.1 M1 Build 20 May 2024

Next Team Meetings:

Key Status/Updates:

  • YP 3.1.33 has been released
  • YP 4.0.18 is due to be released
  • There is an open letter the project has created related to the CVE/NVD situation, more information is available here: https://lists.openembedded.org/g/openembedded-architecture/message/1990 Please consider signing this to show support for those changes. Signatures from small businesses/consultancies are as welcome as those from larger organizations as we want to demonstrate the breadth of the need for these changes.
  • The project is sponsoring Syslinbit to separate out our CVE tooling from the build system into a standalone tool so that it can be used on software manifests of output at a later date.
  • There are proposals on the openembedded-architecture list to rework how do_unpack works, switching it from WORKDIR to a new variable and changing some directory layout.
  • The introduction of UNPACKDIR has happened, maintainers should be able to improve their S=WORKDIR recipes (which should use S, not WORKDIR/UNPACKDIR) and fix the common use of WORKDIR in do_compile/do_install to access files from SRC_URI which should now be UNPACKDIR.
  • gcc 14 has patches pending thanks for Khem and Martin in particular. Merging the new gcc version is needed to generate new uninative tarballs to support Fedora 40 builds or any other distro using the new gcc version.
  • The project is in the process of testing a new way of hosting our autobuilder with plans to switch soon if successful. Our existing hardware is past end of life and showing increased hardware failures so is currently down on capacity meaning builds are taking longer than normal.
  • Mailing list changes now mean any google hosted email accounts have the mailing list From: address rewritten. This had impacted our ability to handle patches but key maintainers now have workarounds for this.

Ways to contribute:

Tracking Metrics:

YP 5.1 Milestone Dates:

  • YP 5.1 M1 Build date 2024-05-20
  • YP 5.1 M1 Release date 2024-05-31
  • YP 5.1 M2 Build date 2024-07-08
  • YP 5.1 M2 Release date 2024-07-19
  • YP 5.1 M3 Build date 2024-08-26
  • YP 5.1 M3 Release date 2024-09-06
  • YP 5.1 M4 Build date 2024-09-30
  • YP 5.1 M4 Release date 2024-10-25

Upcoming dot releases:

  • YP 3.1.33 is released.
  • YP 4.0.18 is ready for release.
  • YP 4.0.18 Release date 2024-05-03
  • YP 5.0.1 Build Date 2024-05-13
  • YP 5.0.1 Release Date 2024-05-24
  • YP 4.0.19 build date 2024-06-03
  • YP 4.0.19 Release date 2024-06-14
  • YP 5.0.2 Build Date 2024-06-24
  • YP 5.0.2 Release Date 2024-07-05
  • YP 4.0.20 Build Date 2024-07-15
  • YP 4.0.20 Release Date 2024-07-26
  • YP 5.0.3 Build Date 2024-08-12
  • YP 5.0.3 Release Date 2024-08-23
  • YP 4.0.21 Build Date 2024-09-09
  • YP 4.0.21 Release Date 2024-09-20
  • YP 5.0.4 Build Date 2024-09-23
  • YP 5.0.4 Release Date 2024-10-04
  • YP 4.0.22 Build Date 2024-10-14
  • YP 4.0.22 Release Date 2024-10-25
  • YP 5.0.5 Build Date 2024-11-11
  • YP 5.0.5 Release Date 2024-11-22
  • YP 4.0.23 Build Date 2024-11-18
  • YP 4.0.23 Release Date 2024-11-29

The Yocto Project’s technical governance is through its Technical Steering Committee, more information is available at:
https://wiki.yoctoproject.org/wiki/TSC

Archives