Yocto Project v1.1 Release Criteria

From Yocto Project
Revision as of 18:40, 3 May 2011 by Jnfleisc (talk | contribs) (→‎Yocto Project 1.0.1: moved to separate page)
Jump to navigationJump to search

The Release Criteria for the various Yocto Project 1.1 releases are below.

Yocto Project 1.1

Release Criteria Milestone 1 Target Milestone 1 Status
Functional Completion All M1 features and BSPs are in the build. "see https://wiki.yoctoproject.org/wiki/Yocto_1.1_Schedule for status
We need to ensure our release process for the milestones is clearly defined. Beth/Jiajun/Julie will discuss.

"

Build and Release (Yocto) All M1 features can be built with no errors. Beth is fixing autobuilder config and will rebuild today. She will also kick off Bernard on master-bernard.
QA can begin testing afterwards.
Build and Release (BSPs) Core and meta-intel BSPs can be built with no errors. Beth is fixing autobuilder config and will rebuild today. She will also kick off Bernard on master-bernard.
QA can begin testing afterwards.
Open Bugs All bugs have been dispositioned. High issues have been fixed. NEW bugs
HIGH priority bugs
Action Item: Saul will assign some of Richard's NEW bugs to the correct owners. Action Item: Bruce will check with his team about bugs 414 and 609. Action Item: Saul will check with Dexuan about bug 828. 828 hasn't been looked at in a month. Action Item: Julie will send another email about the New bugs, and Saul will send one to the meta-data team.
Functional Tests 100% of planned tests are executed and results are logged in bugzilla. Not done?
BSP Testing 100% of planned tests are executed and results are logged in bugzilla. Router station and PPC blocked
[mpc8315e-rdb & routerstationpro] minimal,sato,sato-sdk images boot failed (nightly build 20110423-1) http://bugzilla.pokylinux.org/show_bug.cgi?id=1006
Documentation M1 documentation deliverables are complete. No documentation deliverables exist for M1.
Build Performance Plan for improving performance is defined. Will wait until Richard returns for details.
Upstream Commits Have upstream status updated on 90% of patches (so that we can have a status update) We will have status in at least 90% of the patches. It may be status = "pending."
Marketing Deliverables Giveaway plans defined Julie, Jefro, Darren, Tracey are working on a giveaway plan.
Publication M1 release is announced