Yocto Project v1.0 Release Criteria: Difference between revisions

From Yocto Project
Jump to navigationJump to search
No edit summary
(added March 29 status)
 
(57 intermediate revisions by 2 users not shown)
Line 1: Line 1:
== Yocto v1.0 Release Criteria ==
{| border="1"
{| border="1"
|+ Yocto v1.0 Release Criteria
|+ Release Criteria
! scope="col" | Release Criteria  
! scope="col" | Release Criteria  
! scope="col" | Target
! scope="col" | Target
! scope="col" | Status
! scope="col" | Status
|-
|-
! scope="row" | Development Progress
! scope="row" | Functional Completion
| All M1, M2, M3 features implemented by EO M3
| ''M4 (Gold) Criteria:  All M1, M2, M3 features and BSPs are in build.''
''Current Criteria:  Features are ready to go into master.''
| bgcolor="green" | see [[Yocto 1.0 Schedule#Stabilization Phase Features and Activities]]
| bgcolor="yellow" | on-track
All planned features are in build.
|-
|-
! scope="row" | Build and Release
! scope="row" | Build and Release
(Yocto)
(Yocto)
| Yocto 1.0 code builds reliably
|''M4 (Gold) criteria:  All features in master can be built with no errors.''
''Current criteria:  All features in master can be built.''
| bgcolor="green" | Builds are green for RC4 and RC5.<br>
| bgcolor="orange" | have many changes left to merge into master
RC4:  DISTRO_VERSION isn't at 1.0.<br>
RC5:  DISTRO_VERSION is at 1.0.
|-
|-
! scope="row" | Build and Release
! scope="row" | Build and Release
(BSPs)
(BSPs)
| Yocto BSPs build reliably
| ''M4 (Gold) criteria:  Core and meta-intel BSPs can be built with no errors.''
''Current criteria:  Plan in place to build/QA BSPs by 1.0 release.''
| bgcolor="green" | Builds are green.
| bgcolor="orange" | Resourcing constraints.  Brainstorming whether the BSPs can be build/tested Feb 27th-March 19th.
|-
|-
! scope="row" | Open Bugs
! scope="row" | Open Bugs
| All bugs dispositioned; Show-stoppers fixed
| ''M4 (Gold) criteria:  All bugs have been dispositioned.  Critical/High bugs targeted for M4 have been fixed.''
''Current criteria:  All bugs have been dispositioned.''
| bgcolor="green" | RC4 and RC5:  All High priority bugs have been dispositioned.  All High priority bugs for 1.0 are fixed. *
| bgcolor="orange" | bug count is high; bug triage meetings will hopefully address
|-
|-
! scope="row" | Functional Tests
! scope="row" | Functional Tests
| 100% of planned tests executed
| ''M4 (Gold) criteria:  100% of planned tests are executed and results are logged in bugzilla''
''Current criteria:  Weekly testing is performed on master''
| bgcolor="green" |
| bgcolor="yellow" | testing starts in Feb
RC4:  QA has completed test pass on RC4 except for stress testing. * <br>
RC5:  QA has completed sanity test for RC5.
|-
|-
! scope="row" | BSP Testing
! scope="row" | BSP Testing
| 100% of planned BSP tests executed
| ''M4 (Gold) criteria:  100% of planned BSP tests are executed''
''Current criteria:  TBD - pending BSP plan''
| bgcolor="green" |  
| bgcolor="white" |  
RC4:  QA has completed test pass on RC4 except for stress testing. * <br>
|-
RC5QA has completed sanity test for RC5.
! scope="row" | Legal Compliance
| All legal requirements met
''Current criteriaLegal review Feb 22nd''
| bgcolor="yellow" | in progress
|-
|-
! scope="row" | Alpha Feedback
! scope="row" | Alpha Feedback
| Alpha feedback included
| ''M4 (Gold) criteria:  Alpha runs Feb 11th - Feb 23rd.  Feedback is dispositioned.''
''Current criteria:  Alpha begins Feb 11th''
| bgcolor="#66FF33" | Program completed.  Issues have been dispositioned.
| bgcolor="yellow" | testing starts Feb 11th
|-
|-
! scope="row" | Documentation
! scope="row" | Documentation
| Release Notes created and published
| ''M4 (Gold) criteria:  Release documentation created and published''
''Current criteria:  None yet''
| bgcolor="green" | Planned documentation deliverables are completed.  See [[Yocto_1.0_Schedule#Documentation_Deliverables]]
| bgcolor="white" |  
|-
! scope="row" | Build Performance
| ''M4 (Gold) criteria:  Build takes 90 minutes (stretch goal = one hour) to do a complete rebuild of local sources of poky-image-sato on a developer's desktop.  (The one we are using is: Intel(R) Core(TM) i7 CPU 940 @ 2.93GHz, 8 siblings, 4 cpu cores, total mem 6118644k, with: MACHINE=qemux86, BB_NUMBER_THREADS = "8", PARALLEL_MAKE = "-j 6", and only rpm packaging.)''
| bgcolor="#66FF33" | At 105 minutes.  Team decision that this is not a blocker for 1.0.
|-
! scope="row" | ADT User Workshop
| ''M4 (Gold) criteria:  ADT User Workshop is held where developers use ADT tools to demo software, and results are included.''
| bgcolor="#66FF33" | Running into problems recruiting people, but not a blocker for 1.0 release.
|-
! scope="row" | Upstream Commits
| ''M4 (Gold) criteria:  No goals for Yocto 1.0 - Yocto 1.1 will include more goals.''
||  
|-
|-
! scope="row" | Performance
! scope="row" | Marketing requirements from Engineering complete
| Performance targets achieved
| ''M4 (Gold) criteria:  Yocto demo is prepared for ELC.''
''Current criteria:  Performance enhancement code in master''
| bgcolor="yellow" | Top issues:<br>
| bgcolor="yellow" | TBD
Need to fix bug 919 so that rygel works and audio/video can be played.- Josh had success with previous rygel version.<br>
Need to get video to work on at least one piece of hardware.  (Tom working on.)<br>
Need to ensure PPC can be used as a Content Store.  (Scott G is working on once builds are done.) <br>
|-
|-
! scope="row" | Publication
! scope="row" | Publication
| Release and documentation are published on yoctoproject.org
| ''M4 (Gold) criteria:  Release and documentation are published on yoctoproject.org and Yocto 1.0 is announced''
''Current criteria:  None for this stage''
| bgcolor="yellow" | Release process beginning.  See [[Yocto 1.0 Release Checklist]] for details.
| bgcolor="white" |  
|}
|}


 
== Tunnel Creek BSP Release Criteria ==


{| border="1"
{| border="1"
|+ Tunnel Creek BSP Release Release Criteria
|+ Release Criteria
! scope="col" | Release Criteria  
! scope="col" | Release Criteria  
! scope="col" | Target
! scope="col" | Target
Line 77: Line 85:
! scope="row" | Build and Release
! scope="row" | Build and Release
| EMGD and non-EMGD BSPs build reliably
| EMGD and non-EMGD BSPs build reliably
| bgcolor="green" | Both images are built.
| bgcolor="green" | Build completed
|-
|-
! scope="row" | Open Bugs
! scope="row" | Open Bugs
| All bugs dispositioned; Show-stoppers fixed
| All bugs dispositioned; Show-stoppers fixed
| bgcolor="yellow" | in progress - removable media issue will be documented as bug and logged in Release Notes
| bgcolor="#66FF33" | Only minor bugs found (724, 725)
|-
|-
! scope="row" | Functional Tests
! scope="row" | Functional Tests
| 100% of planned tests executed
| 100% of planned tests executed
| bgcolor="yellow" | Tom is testing both now.  Jaijun will test on Feb 10th.  (Need to send note on his return.)
| bgcolor="green" | 100% testing complete
|-
|-
! scope="row" | Legal Compliance
! scope="row" | Legal Compliance
| All legal requirements met
| All legal requirements met
| bgcolor="orange" | plan in place to create click-through get plan approved
| bgcolor="green" | Click-through completed
|-
|-
! scope="row" | Documentation
! scope="row" | Documentation
| Release Notes created and published
| Release Notes created and published
| bgcolor="#66FF33" | Scott created a draft for Tom's review.
| bgcolor="green" | Done
|-
|-
! scope="row" | Performance  
! scope="row" | Performance  
| Performance targets achieved
| Performance targets achieved
| bgcolor="yellow" | This will be done out of cycle.
| bgcolor="#66FF33" | This will be done out of cycle.
|-
|-
! scope="row" | Publication
! scope="row" | Publication
| Release and documentation are published on yoctoproject.org
| Release and documentation are published on yoctoproject.org
| bgcolor="yellow" | on-track
| bgcolor="green" | Done
|}
|}


 
== Laverne Point Release Criteria ==


{| border="1"
{| border="1"
|+ Laverne Point Release Release Criteria
|+ Release Criteria
! scope="col" | Release Criteria  
! scope="col" | Release Criteria  
! scope="col" | Target
! scope="col" | Target
Line 138: Line 146:
! scope="row" | Publication
! scope="row" | Publication
| Release and documentation are published on yoctoproject.org
| Release and documentation are published on yoctoproject.org
| bgcolor="#66FF33" | on-track
| bgcolor="green" | Complete
|}
|}

Latest revision as of 16:02, 29 March 2011

Yocto v1.0 Release Criteria

Release Criteria
Release Criteria Target Status
Functional Completion M4 (Gold) Criteria: All M1, M2, M3 features and BSPs are in build. see Yocto 1.0 Schedule#Stabilization Phase Features and Activities

All planned features are in build.

Build and Release

(Yocto)

M4 (Gold) criteria: All features in master can be built with no errors. Builds are green for RC4 and RC5.

RC4: DISTRO_VERSION isn't at 1.0.
RC5: DISTRO_VERSION is at 1.0.

Build and Release

(BSPs)

M4 (Gold) criteria: Core and meta-intel BSPs can be built with no errors. Builds are green.
Open Bugs M4 (Gold) criteria: All bugs have been dispositioned. Critical/High bugs targeted for M4 have been fixed. RC4 and RC5: All High priority bugs have been dispositioned. All High priority bugs for 1.0 are fixed. *
Functional Tests M4 (Gold) criteria: 100% of planned tests are executed and results are logged in bugzilla

RC4: QA has completed test pass on RC4 except for stress testing. *
RC5: QA has completed sanity test for RC5.

BSP Testing M4 (Gold) criteria: 100% of planned BSP tests are executed

RC4: QA has completed test pass on RC4 except for stress testing. *
RC5: QA has completed sanity test for RC5.

Alpha Feedback M4 (Gold) criteria: Alpha runs Feb 11th - Feb 23rd. Feedback is dispositioned. Program completed. Issues have been dispositioned.
Documentation M4 (Gold) criteria: Release documentation created and published Planned documentation deliverables are completed. See Yocto_1.0_Schedule#Documentation_Deliverables
Build Performance M4 (Gold) criteria: Build takes 90 minutes (stretch goal = one hour) to do a complete rebuild of local sources of poky-image-sato on a developer's desktop. (The one we are using is: Intel(R) Core(TM) i7 CPU 940 @ 2.93GHz, 8 siblings, 4 cpu cores, total mem 6118644k, with: MACHINE=qemux86, BB_NUMBER_THREADS = "8", PARALLEL_MAKE = "-j 6", and only rpm packaging.) At 105 minutes. Team decision that this is not a blocker for 1.0.
ADT User Workshop M4 (Gold) criteria: ADT User Workshop is held where developers use ADT tools to demo software, and results are included. Running into problems recruiting people, but not a blocker for 1.0 release.
Upstream Commits M4 (Gold) criteria: No goals for Yocto 1.0 - Yocto 1.1 will include more goals.
Marketing requirements from Engineering complete M4 (Gold) criteria: Yocto demo is prepared for ELC. Top issues:

Need to fix bug 919 so that rygel works and audio/video can be played.- Josh had success with previous rygel version.
Need to get video to work on at least one piece of hardware. (Tom working on.)
Need to ensure PPC can be used as a Content Store. (Scott G is working on once builds are done.)

Publication M4 (Gold) criteria: Release and documentation are published on yoctoproject.org and Yocto 1.0 is announced Release process beginning. See Yocto 1.0 Release Checklist for details.

Tunnel Creek BSP Release Criteria

Release Criteria
Release Criteria Target Status
Development progress Features implemented; Code completed Coding completed
Build and Release EMGD and non-EMGD BSPs build reliably Build completed
Open Bugs All bugs dispositioned; Show-stoppers fixed Only minor bugs found (724, 725)
Functional Tests 100% of planned tests executed 100% testing complete
Legal Compliance All legal requirements met Click-through completed
Documentation Release Notes created and published Done
Performance Performance targets achieved This will be done out of cycle.
Publication Release and documentation are published on yoctoproject.org Done

Laverne Point Release Criteria

Release Criteria
Release Criteria Target Status
Development Progress Coding complete Coding completed
Build and Release Code builds reliably Release candidate is built.
Open Bugs All bugs dispositioned; Show-stoppers fixed No opens are show-stoppers. Open issues will be ID'd in release notes.
Functional Tests 100% of planned tests executed testing completed
Legal Compliance All legal requirements met tools run; requirements met
Performance Performance targets achieved N/A
Publication Release and documentation are published on yoctoproject.org Complete