Yocto 1.1 Schedule: Difference between revisions

From Yocto Project
Jump to navigationJump to search
(initial version)
 
(added new M2 items)
Line 21: Line 21:
|-
|-
|| 1.0 Carryover || Image Creator || finish the Image Creator to add features pushed out from 1.0 || 1 || Review || Josh + Jessica || 1.0 Carryover ||
|| 1.0 Carryover || Image Creator || finish the Image Creator to add features pushed out from 1.0 || 1 || Review || Josh + Jessica || 1.0 Carryover ||
|-
|| Architecture || Layer Tooling || This includes the architectural work plus implementing the changes || 1 || Review || Richard || Architect ||
|-
|| Meta-data || Upstream our patches || Placeholder for time for the team to upstream patches || 1 || Review || Saul || Meta-Data Team||
|}
|}



Revision as of 20:17, 14 March 2011

October 2011 (release date: October 6, 2011)


The detailed milestone map for the October 2011 release of Yocto is as below.

pre-M1 (March 14 to April 18 -- Feature List and Schedule Defined April 18)

  • Features Submitted to web - by April 1st
  • Features prioritized and added to schedule - by April 18th

M1 (Apr 18 to Jun 13 -- Design Complete Apr 25, Dev Complete May 23, Stabilize Complete Jun 6, Release Complete Jun 13)

Group Feature Name Description Priority Status Owner Source Comments / Bugzilla Links
1.0 Carryover multi-lib multi-lib support for 32-bit & 64-bit and capable of being installed at the same time 1 Review Richard 1.0 Carryover

M2 (May 30 to Jul 25 -- Design Complete Jun 6, Dev Complete Jul 4, Stabilize Complete Jul 18, Release Complete Jul 25)

Group Feature Name Description Priority Status Owner Source Comments / Bugzilla Links
1.0 Carryover Image Creator finish the Image Creator to add features pushed out from 1.0 1 Review Josh + Jessica 1.0 Carryover
Architecture Layer Tooling This includes the architectural work plus implementing the changes 1 Review Richard Architect
Meta-data Upstream our patches Placeholder for time for the team to upstream patches 1 Review Saul Meta-Data Team

M3 (Jul 11 to Aug 15 -- Design Complete Jul 18, Dev Complete Jul 25, Stabilize Complete Aug 8, Release Complete Aug 15)

Group Feature Name Description Priority Status Owner Source Comments / Bugzilla Links
X X X 1 Review X X

M4 (Aug 15 to Oct 6 -- Stabilize Complete Aug 29, Release Complete Oct 3)

Group Feature Name Description Priority Status Owner Source Comments / Bugzilla Links
X X X 1 Review X X