This is a discussion that happened between benjamin.esquivel@intel.com and anibal.limon@intel.com on Oct 14 2015.


Regarding the SWAT and the Autobuilder notification emails:
It is understandable that the SWAT was coming from a situation where it seemed short of resources and the shift was perceived long but this, as a responsibility group, would work better with perhaps no more than 5/6 engineers. The 1 or 2 weeks are really more a thing to try and see what works best between that group.
Also, when the AB emails work, the TO should include the SWAT team and the SWAT engineer in turn should have a response time of less than half a day, otherwise the other SWAT members can poke him/her to route such issue.
1. It's been long since the AB mails do not work, what can we do to get those working?
2. SWAT was reduced from 2 weeks to 1 and people was added to the SWAT, in our opinion, 1 week is perhaps short and the number of people is arguably larger than optimal.