QA/Test Report Tool: Difference between revisions
From Yocto Project
Jump to navigationJump to search
(Created page with "==General Expectations== Here's a list of initial expectations of the Test Reporting Tool. # The TRT must be able to receive test reports via a remote communication protocol...") |
(No difference)
|
Revision as of 17:55, 1 July 2016
General Expectations
Here's a list of initial expectations of the Test Reporting Tool.
- The TRT must be able to receive test reports via a remote communication protocol.
- From expected sources of results (Auth)
- To existing test buckets (logical test belonging separation, could be by test component)
- Using existing test report protocols like XML
- The TRT should present an interface with views organized towards the following objectives:
- Test Buckets (browsing a component's test results history)
- Test Collections (The type of Milestone/Release or another defined collection)
- The TRT should be able to identify the type of result it is consuming.
- Boolean test results Passed/Failed
- Numeric test results (measurements)