(Created page with '= October 2011 (release date: October 6, 2011) = ---- The detailed milestone map for the October 2011 release of Yocto is as below. == pre-M1 (March 14 to April 18 -- Feature Li…')
 
No edit summary
Line 1: Line 1:
= October 2011 (release date: October 6, 2011) =
= QEMU KVM test results =
----
----
The detailed milestone map for the October 2011 release of Yocto is as below.
The detailed milestone map for the October 2011 release of Yocto is as below.

Revision as of 05:31, 8 April 2011

QEMU KVM test results


The detailed milestone map for the October 2011 release of Yocto is as below.

pre-M1 (March 14 to April 18 -- Feature List and Schedule Defined April 18)

  • Features Submitted to web - by April 1st
  • Features prioritized and added to schedule - by April 12th

M1 (Apr 18 to Jun 13 -- Design Complete Apr 25, Dev Complete May 23, Stabilize Complete Jun 6, Release Complete Jun 13)

Group Feature Name Description Priority Status Owner Source Comments / Bugzilla Links
Architecture OE Core Restructuring, renaming, rebranding 1 Review Richard Architect
1.0 Carryover multi-lib multi-lib support for 32-bit & 64-bit and capable of being installed at the same time 1 Review Richard (Qing) 1.0 Carryover
Meta-Data OE Comparison Compare Yocto core set against integration work in OE and other distributions looking for bug fixes, (relevant) feature enhancements, and integration/policy hints. 1 Accept Mark Meta-data
BSPs Support for AVX as in kernel 2.6.30. - Already in 1.0? Any toolchain support needed? Is it already in GCC? Ensure part of toolchain update (if not already present). Verify with Bruce that AVX is enabled in kernel version XXX? 1 Accept Saul / Nitin Jay / ECG
Misc User creation at post-install 1 Accept Mark (ScottG) Architect
Build Autobuilder maintenance Bring scripts into configuration or get git repo working for those that can't be brought in. (~1.5 weeks) 1 Accept Beth Beth