Yocto Project v1.0 Release Criteria
Yocto v1.0 Release Criteria
Release Criteria | Target | Status |
---|---|---|
Functional Completion | All M1, M2, M3 functional features implemented by EO M3
M4 (Gold) Criteria: All features and BSPs are in build. |
see Yocto 1.0 Schedule#Stabilization Phase Features and Activities
Richard will send a note regarding the four open features. |
Build and Release
(Yocto) |
Yocto 1.0 code builds reliably
M4 (Gold) criteria: All features in master can be built with no errors. |
On track for builds by Friday. Working on corner cases with respect to being branch aware. |
Build and Release
(BSPs) |
Yocto BSPs build reliably
M4 (Gold) criteria: BSPs can be build from master with no errors. |
Could build at least one BSP. On-track for Friday. Beagleboard issue (Beagleboard failed doing runstrip on uboot during do_populate_sysroot) may be fixed - investigating. |
Open Bugs | All bugs dispositioned; Show-stoppers fixed
M4 (Gold) criteria: All bugs have been dispositioned. Critical/High bugs targeted for M4 have been fixed. |
Total new defects: 11 (Bruce, Ke, Dongxiao, Liping, Nitin, Qing)
74 total open defects targeted for 1.0 Critical: 0 High: 16 Medium: 53 Low: 5 |
Functional Tests | 100% of planned tests executed and all bugs are logged in bugzilla
M4 (Gold) criteria: All planned tests are executed and results are logged in bugzilla |
QA is running tests this week. |
BSP Testing | 100% of planned BSP tests executed
M4 (Gold) criteria: All planned BSP tests are executed |
Team is currently blocked, but plan to be able to test next week. |
Alpha Feedback | Alpha feedback included
M4 (Gold) criteria: Alpha begins Feb 11th and completes Feb 23rd |
Program completed. Saul is parsing final results. |
Documentation | Release documentation created and published
M4 (Gold) criteria: M4 schedule items completed |
Yocto_1.0_Schedule#Documentation_Deliverables |
Build Performance | Build takes 90 minutes (stretch goal = one hour) to do a complete rebuild of local sources of poky-image-sato on a developer's desktop. (The one we are using is: Intel(R) Core(TM) i7 CPU 940 @ 2.93GHz, 8 siblings, 4 cpu cores, total mem 6118644k, with: MACHINE=qemux86, BB_NUMBER_THREADS = "8", PARALLEL_MAKE = "-j 6", and only rpm packaging.)
M4 (Gold) criteria: Goal above is reached. |
Team moved down from 109 minute builds to 107 due to some tweaks Richard made. Next steps: Richard, Dongxiao analyze and make changes. Richard review notes from Dave's performance contact. Dongxiao review notes from Dave's performance contact in PRC. |
ADT User Workshop | ADT User Workshop is held where developers use ADT tools to demo software
M4 (Gold) criteria: Workshop is complete. |
Running into problems recruiting people. |
Marketing requirements complete | Engineering requirements to the marketing plan are complete
M4 (Gold) criteria: Yocto demo is prepared for ELC. |
Demo schedule:
March 4th – 0.9 demo brought up against 1.0 branch on eMenlow, Netbook, Router Station Pro (Joshua) - on-track March 11th – Know which media codecs we need/which videos we need to support (Julie) March 18th – Required software for video brought up March 18th – PPC, Beagleboard done March 18th – Sandybridge received or no-go for Sandybridge This could be a “when we get it” test milestone. March 25th – Images built and tested for each target / Demo app brought up March 25th – Sandybridge development done March 25th – Demo integrated without Sandybridge April 1st – Demo integrated and ready for Linux Collab Summit April 5th – Marketing trained on demo |
Publication | Release and documentation are published on yoctoproject.org
M4 (Gold) criteria: Yocto Project 1.0 published and announced |
Tunnel Creek BSP Release Criteria
Release Criteria | Target | Status |
---|---|---|
Development progress | Features implemented; Code completed | Coding completed |
Build and Release | EMGD and non-EMGD BSPs build reliably | Build completed |
Open Bugs | All bugs dispositioned; Show-stoppers fixed | Only minor bugs found (724, 725) |
Functional Tests | 100% of planned tests executed | Tom tested. Jiajun will test Thursday. |
Legal Compliance | All legal requirements met | Account is set up for click-through. Click-through team has info they need. |
Documentation | Release Notes created and published | Scott/Tom are finalizing and things look good. |
Performance | Performance targets achieved | This will be done out of cycle. |
Publication | Release and documentation are published on yoctoproject.org | on-track |
Laverne Point Release Criteria
Release Criteria | Target | Status |
---|---|---|
Development Progress | Coding complete | Coding completed |
Build and Release | Code builds reliably | Release candidate is built. |
Open Bugs | All bugs dispositioned; Show-stoppers fixed | No opens are show-stoppers. Open issues will be ID'd in release notes. |
Functional Tests | 100% of planned tests executed | testing completed |
Legal Compliance | All legal requirements met | tools run; requirements met |
Performance | Performance targets achieved | N/A |
Publication | Release and documentation are published on yoctoproject.org | Complete |