Toaster testing plan
From Yocto Project
Jump to navigationJump to search
Introduction
This article is the test plan for Toaster.
Objectives
The test process focuses on:
- validating the data collected from the build process
- verifying the correct functioning of the Toaster GUI.
Test Areas
The Toaster consists of two big components, as follows:
Backend
Functionality tests
- REST APIs verification – create django tests in order to find out what fields are empty from the response returned by the API called;
- Calculation of the data collection rate;
- Verify if all the links from the simple UI are available;
- Verify the quality of the data collected through the simple UI;
Usability tests
- Verify the easy usage of the Toaster (easy to install and stop/start the toaster server)
Frontend
Functionality tests
- Manual testing in the first stage;
- Automate testing using Selenium, in the second stage;
Compatibility tests
- Verify the behavior of the GUI on different browsers and operating systems;
Usability tests
- Verify if the GUI design is as described here: https://wiki.yoctoproject.org/wiki/WebHob#User_interface;
- Friendly graphical user interface;
Performance tests
- Stress testing (e.g. display appropriate error messages when the system is under stress);