Toaster testing plan
From Yocto Project
				
				
				Jump to navigationJump to search
				
				
Introduction
This article is the test plan for Toaster.
Objectives
The test process focuses on:
- validating the data collected from the build process
 - verifying the correct functioning of the Toaster GUI.
 
Test Areas
Toaster consists of two big components, as follows:
Backend
Functionality tests
- REST API verification – create Django tests to detect API calls returning no data;
 - Calculation of the data collection rate - the ratio of the number of the variables having null values and the total number of variables collected;
 - Verify that all links in the simple UI are available;
 - Verify the quality of the data collected through the simple UI;
 
Usability tests
- Verify the easy usage of Toaster (easy to install and stop/start the toaster server)
 
Frontend
Functionality tests
- Manual testing in the first stage;
 - Automate testing using Selenium, in the second stage;
 
Compatibility tests
- Verify the behavior of the GUI on different browsers and operating systems;
 
Usability tests
- Verify if the GUI design is as described here: http://yoctoproject.org/webhob;
 - Friendly graphical user interface;
 
Performance tests
- Stress testing (e.g. display appropriate error messages when the system is under stress);
 
perf 2
| Test execution cycle | |||||
|---|---|---|---|---|---|
| #Weekly Test | #Full Pass Test | ||||
| Build type | |||||
| Weekly | yes | ||||
| Build type | #Backend | yes | yes | ||
| #Frontend | yes | ||||
| Target machine | |||||
| qemuarm | yes | yes | |||
| qemumips | yes | ||||
| qemuppc | yes | ||||
| qemux86 | yes | yes | |||
| Test execution cycle | |||
| #Weekly Test | #Full Pass Test | ||
| Build type | Weekly | Yes | Yes | 
| Build type | #Backend | Yes | Yes | 
| #Frontend | Yes | Yes | |
| Target machine | qemuarm | Yes | Yes | 
| qemumips | Yes | ||
| qemuppc | Yes | ||
| qemux86 | Yes | Yes | |
| Target image | core-image-minimal | Yes | Yes | 
| core-image-sato | Yes | ||