Yocto Project v1.0 Release Criteria
From Yocto Project
Jump to navigationJump to search
Yocto v1.0 Release Criteria
Release Criteria | Target | Status |
---|---|---|
Functional Completion | All M1, M2, M3 functional features implemented by EO M3
Current Criteria: Functional features are ready to go into master. |
see Yocto 1.0 Schedule#Stabilization Phase Features and Activities |
Build and Release
(Yocto) |
Yocto 1.0 code builds reliably
Current criteria: All features in master can be built. |
some oddities noted in incremental builds (possibly related to dependencies), working on reproducing; other minor issues are showing up on autobuilder, nothing major - on-track |
Build and Release
(BSPs) |
Yocto BSPs build reliably
Current criteria: BSPs are built for testing. |
first BSP build will come over the Weekend (autobuilder02 networking issues) |
Open Bugs | All bugs dispositioned; Show-stoppers fixed
Current criteria: All bugs have been dispositioned. |
65 bugs not yet dispositioned (in "New" state); Owners: Tom, Scott, Saul, Richard, Qing, Paul, Nitin, Mark, Ke, Julie, Josh, Jeff, Edwin, Darren, Dongxiao); one Critical/High - bug 734; six Major/High |
Functional Tests | 100% of planned tests executed and all bugs are logged in bugzilla
Current criteria: Weekly testing is performed on master and all bugs in bugzilla |
on-track |
BSP Testing | 100% of planned BSP tests executed
Current criteria: BSPs are tested at least once during master stabilization |
on-track |
Alpha Feedback | Alpha feedback included
Current criteria: Alpha begins Feb 11th and completes Feb 23rd |
testing has begun; at least two bugs filed so far |
Documentation | Release documentation created and published
Current criteria: M4 schedule items completed |
Yocto_1.0_Schedule#Documentation_Deliverables |
Build Performance | Build takes 90 minutes (stretch goal = one hour) to do a complete rebuild of local sources of poky-image-sato on a developer's desktop. (The one we are using is: Intel(R) Core(TM) i7 CPU 940 @ 2.93GHz, 8 siblings, 4 cpu cores, total mem 6118644k, with: MACHINE=qemux86, BB_NUMBER_THREADS = "8", PARALLEL_MAKE = "-j 6", and only rpm packaging.)
Current criteria: Richard and PRC team complete performance analysis. |
Goal is to have a list of potential actions to take based on analysis next week. |
Marketing requirements complete | Engineering requirements to the marketing plan are complete
Current criteria: Yocto demo is prepared for ELC. |
Have hardware on order. Need videos. Need plexiglass boxes. Coding effort underway, but not complete. |
Publication | Release and documentation are published on yoctoproject.org
Current criteria: None for this stage |
Tunnel Creek BSP Release Criteria
Release Criteria | Target | Status |
---|---|---|
Development progress | Features implemented; Code completed | Coding completed |
Build and Release | EMGD and non-EMGD BSPs build reliably | Build completed |
Open Bugs | All bugs dispositioned; Show-stoppers fixed | Only minor bugs found (724, 725) |
Functional Tests | 100% of planned tests executed | Tom tested. Jiajun will test Thursday. |
Legal Compliance | All legal requirements met | Account is set up for click-through. Click-through team has info they need. |
Documentation | Release Notes created and published | Scott/Tom are finalizing and things look good. |
Performance | Performance targets achieved | This will be done out of cycle. |
Publication | Release and documentation are published on yoctoproject.org | on-track |
Laverne Point Release Criteria
Release Criteria | Target | Status |
---|---|---|
Development Progress | Coding complete | Coding completed |
Build and Release | Code builds reliably | Release candidate is built. |
Open Bugs | All bugs dispositioned; Show-stoppers fixed | No opens are show-stoppers. Open issues will be ID'd in release notes. |
Functional Tests | 100% of planned tests executed | testing completed |
Legal Compliance | All legal requirements met | tools run; requirements met |
Performance | Performance targets achieved | N/A |
Publication | Release and documentation are published on yoctoproject.org | Complete |