Yocto Project v1.0 Release Criteria: Difference between revisions
Line 87: | Line 87: | ||
! scope="row" | Build and Release | ! scope="row" | Build and Release | ||
| EMGD and non-EMGD BSPs build reliably | | EMGD and non-EMGD BSPs build reliably | ||
| bgcolor=" | | bgcolor="green" | Build completed | ||
|- | |- | ||
! scope="row" | Open Bugs | ! scope="row" | Open Bugs | ||
Line 95: | Line 95: | ||
! scope="row" | Functional Tests | ! scope="row" | Functional Tests | ||
| 100% of planned tests executed | | 100% of planned tests executed | ||
| bgcolor=" | | bgcolor="green" | 100% testing complete | ||
|- | |- | ||
! scope="row" | Legal Compliance | ! scope="row" | Legal Compliance | ||
| All legal requirements met | | All legal requirements met | ||
| bgcolor=" | | bgcolor="green" | Click-through completed | ||
|- | |- | ||
! scope="row" | Documentation | ! scope="row" | Documentation | ||
| Release Notes created and published | | Release Notes created and published | ||
| bgcolor=" | | bgcolor="green" | Done | ||
|- | |- | ||
! scope="row" | Performance | ! scope="row" | Performance |
Revision as of 19:34, 3 March 2011
Yocto v1.0 Release Criteria
Release Criteria | Target | Status |
---|---|---|
Functional Completion | M4 (Gold) Criteria: All M1, M2, M3 features and BSPs are in build. | see Yocto 1.0 Schedule#Stabilization Phase Features and Activities
Richard will send a note regarding the four open features. |
Build and Release
(Yocto) |
M4 (Gold) criteria: All features in master can be built with no errors. | On track for builds by Friday. Working on corner cases with respect to being branch aware. |
Build and Release
(BSPs) |
M4 (Gold) criteria: Core and meta-intel BSPs can be built with no errors. | Could build at least one BSP. On-track for Friday. Beagleboard issue (Beagleboard failed doing runstrip on uboot during do_populate_sysroot) may be fixed - investigating. |
Open Bugs | M4 (Gold) criteria: All bugs have been dispositioned. Critical/High bugs targeted for M4 have been fixed. | Total new defects: 11 (Bruce, Ke, Dongxiao, Liping, Nitin, Qing)
74 total open defects targeted for 1.0 Critical: 0 High: 16 Medium: 53 Low: 5 |
Functional Tests | M4 (Gold) criteria: 100% of planned tests are executed and results are logged in bugzilla | QA is running tests this week. |
BSP Testing | M4 (Gold) criteria: 100% of planned BSP tests are executed | Team is currently blocked, but plan to be able to test next week. |
Alpha Feedback | M4 (Gold) criteria: Alpha runs Feb 11th - Feb 23rd. Feedback is dispositioned. | Program completed. Saul is parsing final results. |
Documentation | M4 (Gold) criteria: Release documentation created and published | Yocto_1.0_Schedule#Documentation_Deliverables |
Build Performance | M4 (Gold) criteria: Build takes 90 minutes (stretch goal = one hour) to do a complete rebuild of local sources of poky-image-sato on a developer's desktop. (The one we are using is: Intel(R) Core(TM) i7 CPU 940 @ 2.93GHz, 8 siblings, 4 cpu cores, total mem 6118644k, with: MACHINE=qemux86, BB_NUMBER_THREADS = "8", PARALLEL_MAKE = "-j 6", and only rpm packaging.) | Team moved down from 109 minute builds to 107 due to some tweaks Richard made. Next steps: Richard, Dongxiao analyze and make changes. Richard review notes from Dave's performance contact. Dongxiao review notes from Dave's performance contact in PRC. |
ADT User Workshop | M4 (Gold) criteria: ADT User Workshop is held where developers use ADT tools to demo software, and results are included. | Running into problems recruiting people. |
Marketing requirements from Engineering complete | M4 (Gold) criteria: Yocto demo is prepared for ELC. | Demo schedule:
March 4th – 0.9 demo brought up against 1.0 branch on eMenlow, Netbook, Router Station Pro (Joshua) - on-track March 11th – Know which media codecs we need/which videos we need to support (Julie) March 18th – Required software for video brought up March 18th – PPC, Beagleboard done March 18th – Sandybridge received or no-go for Sandybridge This could be a “when we get it” test milestone. March 25th – Images built and tested for each target / Demo app brought up March 25th – Sandybridge development done March 25th – Demo integrated without Sandybridge April 1st – Demo integrated and ready for Linux Collab Summit April 5th – Marketing trained on demo |
Publication | M4 (Gold) criteria: Release and documentation are published on yoctoproject.org and Yocto 1.0 is announced |
Tunnel Creek BSP Release Criteria
Release Criteria | Target | Status |
---|---|---|
Development progress | Features implemented; Code completed | Coding completed |
Build and Release | EMGD and non-EMGD BSPs build reliably | Build completed |
Open Bugs | All bugs dispositioned; Show-stoppers fixed | Only minor bugs found (724, 725) |
Functional Tests | 100% of planned tests executed | 100% testing complete |
Legal Compliance | All legal requirements met | Click-through completed |
Documentation | Release Notes created and published | Done |
Performance | Performance targets achieved | This will be done out of cycle. |
Publication | Release and documentation are published on yoctoproject.org | on-track |
Laverne Point Release Criteria
Release Criteria | Target | Status |
---|---|---|
Development Progress | Coding complete | Coding completed |
Build and Release | Code builds reliably | Release candidate is built. |
Open Bugs | All bugs dispositioned; Show-stoppers fixed | No opens are show-stoppers. Open issues will be ID'd in release notes. |
Functional Tests | 100% of planned tests executed | testing completed |
Legal Compliance | All legal requirements met | tools run; requirements met |
Performance | Performance targets achieved | N/A |
Publication | Release and documentation are published on yoctoproject.org | Complete |