Yocto Project v1.0 Release Criteria: Difference between revisions
Line 32: | Line 32: | ||
! scope="row" | Functional Tests | ! scope="row" | Functional Tests | ||
| ''M4 (Gold) criteria: 100% of planned tests are executed and results are logged in bugzilla'' | | ''M4 (Gold) criteria: 100% of planned tests are executed and results are logged in bugzilla'' | ||
| bgcolor="yellow" | QA | | bgcolor="yellow" | QA will run a test pass this week. | ||
|- | |- | ||
! scope="row" | BSP Testing | ! scope="row" | BSP Testing | ||
| ''M4 (Gold) criteria: 100% of planned BSP tests are executed'' | | ''M4 (Gold) criteria: 100% of planned BSP tests are executed'' | ||
| bgcolor="orange" | | | bgcolor="orange" | QA can run a partial test pass this week. | ||
|- | |- | ||
! scope="row" | Alpha Feedback | ! scope="row" | Alpha Feedback | ||
Line 48: | Line 48: | ||
! scope="row" | Build Performance | ! scope="row" | Build Performance | ||
| ''M4 (Gold) criteria: Build takes 90 minutes (stretch goal = one hour) to do a complete rebuild of local sources of poky-image-sato on a developer's desktop. (The one we are using is: Intel(R) Core(TM) i7 CPU 940 @ 2.93GHz, 8 siblings, 4 cpu cores, total mem 6118644k, with: MACHINE=qemux86, BB_NUMBER_THREADS = "8", PARALLEL_MAKE = "-j 6", and only rpm packaging.)'' | | ''M4 (Gold) criteria: Build takes 90 minutes (stretch goal = one hour) to do a complete rebuild of local sources of poky-image-sato on a developer's desktop. (The one we are using is: Intel(R) Core(TM) i7 CPU 940 @ 2.93GHz, 8 siblings, 4 cpu cores, total mem 6118644k, with: MACHINE=qemux86, BB_NUMBER_THREADS = "8", PARALLEL_MAKE = "-j 6", and only rpm packaging.)'' | ||
| bgcolor="yellow" | | | bgcolor="yellow" | At 107 minutes. Team will continue to monitor, but acknowledges other areas are more critical to finish. | ||
|- | |- | ||
! scope="row" | ADT User Workshop | ! scope="row" | ADT User Workshop |
Revision as of 06:45, 8 March 2011
Yocto v1.0 Release Criteria
Release Criteria | Target | Status |
---|---|---|
Functional Completion | M4 (Gold) Criteria: All M1, M2, M3 features and BSPs are in build. | see Yocto 1.0 Schedule#Stabilization Phase Features and Activities
All planned features are in build. |
Build and Release
(Yocto) |
M4 (Gold) criteria: All features in master can be built with no errors. | Still not green on builds; had some dependency failures related to performance changes - working on that; toolchain built, but not in right place |
Build and Release
(BSPs) |
M4 (Gold) criteria: Core and meta-intel BSPs can be built with no errors. | Core BSPs are green. Beagleboard still needs video added (will do via branch - will make assessment based on patch). meta-intel still has some failures (Jasper Forest has failures in mesa-dri). QA can still do limited testing. |
Open Bugs | M4 (Gold) criteria: All bugs have been dispositioned. Critical/High bugs targeted for M4 have been fixed. | Total new defects: 11 (Bruce, Ke, Dongxiao, Liping, Nitin, Qing)
74 total open defects targeted for 1.0 Critical: 0 High: 16 Medium: 53 Low: 5 |
Functional Tests | M4 (Gold) criteria: 100% of planned tests are executed and results are logged in bugzilla | QA will run a test pass this week. |
BSP Testing | M4 (Gold) criteria: 100% of planned BSP tests are executed | QA can run a partial test pass this week. |
Alpha Feedback | M4 (Gold) criteria: Alpha runs Feb 11th - Feb 23rd. Feedback is dispositioned. | Program completed. Saul is parsing final results. |
Documentation | M4 (Gold) criteria: Release documentation created and published | Yocto_1.0_Schedule#Documentation_Deliverables |
Build Performance | M4 (Gold) criteria: Build takes 90 minutes (stretch goal = one hour) to do a complete rebuild of local sources of poky-image-sato on a developer's desktop. (The one we are using is: Intel(R) Core(TM) i7 CPU 940 @ 2.93GHz, 8 siblings, 4 cpu cores, total mem 6118644k, with: MACHINE=qemux86, BB_NUMBER_THREADS = "8", PARALLEL_MAKE = "-j 6", and only rpm packaging.) | At 107 minutes. Team will continue to monitor, but acknowledges other areas are more critical to finish. |
ADT User Workshop | M4 (Gold) criteria: ADT User Workshop is held where developers use ADT tools to demo software, and results are included. | Running into problems recruiting people. |
Marketing requirements from Engineering complete | M4 (Gold) criteria: Yocto demo is prepared for ELC. | Demo schedule:
March 4th – 0.9 demo brought up against 1.0 branch on eMenlow, Netbook, Router Station Pro (Joshua) - images built, but not tested March 11th – Know which media codecs we need/which videos we need to support (Julie) - DONE March 18th – Required software for video brought up March 18th – PPC, Beagleboard done March 18th – Sandybridge received or no-go for Sandybridge This could be a “when we get it” test milestone. March 25th – Images built and tested for each target / Demo app brought up March 25th – Sandybridge development done March 25th – Demo integrated without Sandybridge April 1st – Demo integrated and ready for Linux Collab Summit April 5th – Marketing trained on demo |
Publication | M4 (Gold) criteria: Release and documentation are published on yoctoproject.org and Yocto 1.0 is announced |
Tunnel Creek BSP Release Criteria
Release Criteria | Target | Status |
---|---|---|
Development progress | Features implemented; Code completed | Coding completed |
Build and Release | EMGD and non-EMGD BSPs build reliably | Build completed |
Open Bugs | All bugs dispositioned; Show-stoppers fixed | Only minor bugs found (724, 725) |
Functional Tests | 100% of planned tests executed | 100% testing complete |
Legal Compliance | All legal requirements met | Click-through completed |
Documentation | Release Notes created and published | Done |
Performance | Performance targets achieved | This will be done out of cycle. |
Publication | Release and documentation are published on yoctoproject.org | on-track |
Laverne Point Release Criteria
Release Criteria | Target | Status |
---|---|---|
Development Progress | Coding complete | Coding completed |
Build and Release | Code builds reliably | Release candidate is built. |
Open Bugs | All bugs dispositioned; Show-stoppers fixed | No opens are show-stoppers. Open issues will be ID'd in release notes. |
Functional Tests | 100% of planned tests executed | testing completed |
Legal Compliance | All legal requirements met | tools run; requirements met |
Performance | Performance targets achieved | N/A |
Publication | Release and documentation are published on yoctoproject.org | Complete |