== Design == | == Design == | ||
=== Stage II & III === | |||
<br> | |||
==== Scenarios Covered ==== | |||
=== Stage I === | === Stage I === | ||
* Create Build | |||
** Set up Project | |||
** Choose Hardware | |||
** Set Preferences | |||
** Specify Layer(s) | |||
** Specify base image and package(s) | |||
** Run Build | |||
* Install Web Hob Server | |||
** Configure team servers | |||
** Select team options and configure | |||
* Error Messaging | |||
** View error logs | |||
* Refine scenarios from Stage I | |||
====Schedule ==== | |||
* '''4 Feb 2013''' — Workshop | |||
* '''8 Feb''' — 1st review | |||
* '''12–14 Feb''' — User testing | |||
* '''15 Feb''' — User testing review | |||
* '''20 Feb''' — 2nd review | |||
* '''22 Feb''' — Final review | |||
<br> | |||
==== Latest Files ==== | ==== Latest Files ==== |
Revision as of 16:00, 5 February 2013
This page contains information on the Web Hob project to develop a web-based UI for the Yocto project.
Mailing List: https://lists.yoctoproject.org/listinfo/webhob
Design
Stage II & III
Scenarios Covered
Stage I
- Create Build
- Set up Project
- Choose Hardware
- Set Preferences
- Specify Layer(s)
- Specify base image and package(s)
- Run Build
- Install Web Hob Server
- Configure team servers
- Select team options and configure
- Error Messaging
- View error logs
- Refine scenarios from Stage I
Schedule
- 4 Feb 2013 — Workshop
- 8 Feb — 1st review
- 12–14 Feb — User testing
- 15 Feb — User testing review
- 20 Feb — 2nd review
- 22 Feb — Final review
Latest Files
- File:Wireframes-Stage 1-INT-002-0.10.pdf — Final Stage 1 Wireframes
- Prototype 0.2
- File:User Test 1 Findings-INT-002.pdf
Scenarios Covered
- Show Build Metrics (minimal)
- Identify image (minimal)
- Define scope of analysis (minimal)
- Run analysis of image (minimal)
- View analysis overview (minimal)
- Finding/Viewing Builds (minimal)
- View list of projects/builds (minimal)
- Install Single-User Web Hob (minimal)
- Check prerequisites (minimal)
- Download/git clone Web Hob (minimal)
- Install single-user option (minimal)
Schedule
- 11 Jan 2013 — Kickoff
- 14 Jan — Workshop
- 18 Jan — 1st review
- 22–24 Jan — User testing
- 25 Jan — User testing review
- 30 Jan — 2nd review
- 1 Feb — Final review
Previous Files
Old Work
- WebHob Design — Archived - Design and documentation for the first Web Hob project, now superseded by the above.
- Web UI 0.1: File:HOB WEB architecture overview v0 1.pdf (deprecated)