Web Hob design project with T&T: Difference between revisions

From Yocto Project
Jump to navigationJump to search
Line 29: Line 29:
====Schedule ====
====Schedule ====


'''11 Jan 2013''' — Kickoff
* '''11 Jan 2013''' — Kickoff
'''14 Jan'' — Workshop
* '''14 Jan'' — Workshop
'''18 Jan''' — 1st review
* '''18 Jan''' — 1st review
'''22–24 Jan''' — User testing
* '''22–24 Jan''' — User testing
'''25 Jan''' — User testing review
* '''25 Jan''' — User testing review
''''30 Jan'' — 2nd review
* ''''30 Jan'' — 2nd review
'''1 Feb''' — Final review
* '''1 Feb''' — Final review
 
 
 
 


=== Old Work ===
=== Old Work ===

Revision as of 17:23, 22 January 2013

This page holds the history for Web UI design and implementation.

Mailing List: https://lists.yoctoproject.org/listinfo/webhob

Design

Stage I

Latest Files

Prototype 0.2


Scenarios Covered

  • Show Build Metrics (minimal)
    • Identify image (minimal)
    • Define scope of analysis (minimal)
    • Run analysis of image (minimal)
    • View analysis overview (minimal)
  • Finding/Viewing Builds (minimal)
    • View list of projects/builds (minimal)
  • Install Single-User Web Hob (minimal)
    • Check prerequisites (minimal)
    • Download/git clone Web Hob (minimal)
    • Install single-user option (minimal)


Schedule

  • 11 Jan 2013 — Kickoff
  • '14 Jan — Workshop
  • 18 Jan — 1st review
  • 22–24 Jan — User testing
  • 25 Jan — User testing review
  • ''30 Jan — 2nd review
  • 1 Feb — Final review

Old Work