Line 215: | Line 215: | ||
<br/><br/> | <br/><br/> | ||
== Milestone 2 - Target | == Milestone 2 - Target TBD == | ||
{| border="1" {{table}} | {| border="1" {{table}} | ||
| ! scope="col" bgcolor="grey" | '''Release Criteria''' || ! scope="col" bgcolor="grey" | '''Milestone 2 Target''' || ! scope="col" bgcolor="grey" | '''Milestone 2 Status''' | | ! scope="col" bgcolor="grey" | '''Release Criteria''' || ! scope="col" bgcolor="grey" | '''Milestone 2 Target''' || ! scope="col" bgcolor="grey" | '''Milestone 2 Status''' | ||
|- | |- | ||
| Functional Completion || All high features are completed. || bgcolor=" | | Functional Completion || All high features are completed. || bgcolor="" | | ||
|- | |- | ||
| Build and Release (Yocto) || All completed features can be built with no errors. || bgcolor=" | | Build and Release (Yocto) || All completed features can be built with no errors. || bgcolor="" | | ||
|- | |- | ||
| Build and Release (BSPs) || Core BSPs can be built with no errors. || bgcolor=" | | Build and Release (BSPs) || Core BSPs can be built with no errors. || bgcolor="" | | ||
|- | |- | ||
| Open Bugs || All bugs have been dispositioned. Milestone high issues have been fixed. || bgcolor=" | | Open Bugs || All bugs have been dispositioned. Milestone high issues have been fixed. || bgcolor="" | [https://bugzilla.yoctoproject.org/buglist.cgi?priority=High&priority=Medium%2B&list_id=23883&bug_severity=critical&bug_severity=major&bug_severity=normal&bug_severity=minor&bug_severity=janitors&query_format=advanced&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ACCEPTED&bug_status=IN%20PROGRESS%20DESIGN&bug_status=IN%20PROGRESS%20DESIGN%20COMPLETE&bug_status=IN%20PROGRESS%20IMPLEMENTATION&bug_status=IN%20PROGRESS%20REVIEW&bug_status=REOPENED&bug_status=NEEDINFO&bug_status=WaitForUpstream&target_milestone=2.7&target_milestone=2.7%20M1&target_milestone=2.7%20M2] | ||
|- | |- | ||
| Functional Tests || 100% of planned tests are executed and results are logged in bugzilla. || bgcolor=" | | Functional Tests || 100% of planned tests are executed and results are logged in bugzilla. || bgcolor="" | | ||
|- | |- | ||
| Distros Tested || Fedora, Ubuntu, Opensuse, Centos current version || bgcolor=" | | Distros Tested || Fedora, Ubuntu, Opensuse, Centos current version || bgcolor="" | | ||
|- | |- | ||
| BSP Testing || 100% of planned tests are executed and results are logged in bugzilla. || bgcolor=" | | BSP Testing || 100% of planned tests are executed and results are logged in bugzilla. || bgcolor="" | | ||
|- | |- | ||
| Build Performance || Try to at least maintain the current performance and improve if possible. || bgcolor=" | | Build Performance || Try to at least maintain the current performance and improve if possible. || bgcolor="" | | ||
|- | |- | ||
| Package Update || Plan to have 70% or greater packages updated. || bgcolor=" | | Package Update || Plan to have 70% or greater packages updated. || bgcolor="" | | ||
|- | |- | ||
| Patch Upstream Status || Less than 50% of all patches in Pending state. || bgcolor=" | | Patch Upstream Status || Less than 50% of all patches in Pending state. || bgcolor="" | | ||
|- | |- | ||
| Publication || The release is announced || bgcolor=" | | Publication || The release is announced || bgcolor="" | | ||
|} | |} | ||
<br/><br/> | <br/><br/> |
Revision as of 20:03, 30 October 2018
Yocto Project 2.7 release Status - Work in progress
Project Dashboard
https://wiki.yoctoproject.org/charts/combo.html
Feature/Task Board
Overview
Scheduled | Design | Design Complete | Development | Patch Review | Testing | Done | Blocked | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
"None"
|
"None"
|
"None"
|
"None"
|
"None"
|
|
no bugzilla tickets were found
|
"None"
|
List View
Blocked
ID | Assignee | E | Whiteboard | Milestone | Status |
---|---|---|---|---|---|
0 |
Planned
ID | Assignee | P | E | Summary | Whiteboard | Milestone | Status |
---|---|---|---|---|---|---|---|
0 |
Scheduled
ID | Assignee | P | E | Summary | Whiteboard | Milestone | Status |
---|---|---|---|---|---|---|---|
0 |
Design
ID | Assignee | P | E | Summary | Whiteboard | Milestone | Status |
---|---|---|---|---|---|---|---|
0 |
Design Complete
ID | Assignee | P | E | Summary | Whiteboard | Milestone | Status |
---|---|---|---|---|---|---|---|
0 |
Development
ID | Assignee | P | E | Summary | Whiteboard | Milestone | Status |
---|---|---|---|---|---|---|---|
0 |
Patch Review
ID | Assignee | P | E | Summary | Whiteboard | Milestone | Status |
---|---|---|---|---|---|---|---|
0 |
Testing
ID | Assignee | P | E | Summary (24 tasks) ⇒ | Whiteboard | Milestone | Status |
---|---|---|---|---|---|---|---|
11583 | yeoh ee peng | Medium+ | 4 | oeqa: core add support to publish results | 2.7 M1 | RESOLVED | |
12774 | Hongzhi | Medium+ | oeqa: kernel config depenency for some kernel test cases | 2.7 M1 | RESOLVED | ||
12332 | Michael Halstead | Medium+ | 2 | Regularly purge the error report database | 2.7 M1 | RESOLVED | |
13058 | André Draszik | Medium+ | 2 | split util-linux automatically instead of hard coding | 2.7 M2 | RESOLVED | |
13094 | David Reyna | Medium | 3 | support custom extensions to reports | 2.7 M2 | RESOLVED | |
13110 | David Reyna | Medium | 3 | Add "release" records to product records | 2.7 M2 | RESOLVED | |
12931 | Joshua Watt | Medium+ | 5 | Change default PACKAGE_DEBUG_SPLIT_STYLE to "debug-with-srcpkg" | 2.7 M2 | RESOLVED | |
13030 | Joshua Watt | Medium+ | Add sstate hash equivalence support | 2.7 M2 | RESOLVED | ||
13088 | Aníbal Limón | Medium+ | 0.3 | Add support for extracting individual ptest timing | 2.7 M2 | RESOLVED | |
12421 | Mingli Yu | Medium+ | Host-compiled Python bytecode not reproducible | 2.7 M2 | RESOLVED | ||
13011 | Richard Purdie | Medium+ | Start collecting ptest for arm and x86 on Vtargets. | 2.7 M2 | RESOLVED | ||
13114 | Ross Burton | Medium+ | Split python3-ctypes tests package | 2.7 M2 | RESOLVED | ||
13012 | Apoorv | Medium+ | 10 | Create/merge results aggregation and analysis tool | 2.7 M3 | RESOLVED | |
12654 | yeoh ee peng | High | 10 | QA test results management to replace Testopia | 2.7 M3 | RESOLVED | |
12980 | Jon Mason | Medium+ | 5 | qemuarm rename to qemuarmv5 and change to v7 as default | 2.7 M3 | RESOLVED | |
12981 | Jon Mason | Medium+ | 5 | Switch qemuarm to qemu -m virt rather than versatilepb | 2.7 M3 | RESOLVED | |
11522 | Robert Yang | Medium+ | 2 | runqemu env var QB_MEM expects to be set to "-m 256" not "256" or "256M" | 2.7 M3 | RESOLVED | |
12650 | Mazliana | Medium+ | 2 | Export manual test cases from Testopia to oeqa | 2.7 M3 | RESOLVED | |
12651 | Mazliana | Medium+ | 14 | Simple script to help manual test execution in populating test results into desired format | 2.7 M3 | RESOLVED | |
13013 | Richard Purdie | Medium+ | Run results aggregation and analysis on the autobuilder | 2.7 M3 | RESOLVED | ||
13014 | Richard Purdie | Medium+ | Handle triggering and collection of build performance data for release builds | 2.7 M3 | RESOLVED | ||
6077 | Changqing Li | Low | 2 | piglit depends on libx11 | 2.7 M4 | RESOLVED | |
8591 | Robert Yang | Medium | 10 | bitbake world needs a lot of time for "Preparing RunQueue" | 2.7 M4 | RESOLVED | |
12548 | Scott Rifenbark | Medium | 5 | Document variable assignment for DISTRO_FEATURES, IMAGE_FEATURES, SDKIMAGE_FEATURES, etc | 23 April 2019: RESOLVED | 2.7 M4 | RESOLVED |
84.3 |
Done
ID | Assignee | P | E | Summary | Whiteboard | Milestone | Status |
---|---|---|---|---|---|---|---|
0 |
Yocto Project v2.7 Release Criteria
Milestone 1 - Target TBD
Release Criteria | Milestone 1 Target | Milestone 1 Status |
Functional Completion | All high features are completed. | |
Build and Release (Yocto) | All completed features can be built with no errors. | |
Build and Release (BSPs) | Core BSPs can be built with no errors. | |
Open Bugs | All bugs have been dispositioned. Milestone high issues have been fixed. | [1] |
Functional Tests | 100% of planned tests are executed and results are logged in bugzilla. | |
Distros Tested | Fedora, Ubuntu, Opensuse, Centos current version | |
BSP Testing | 100% of planned tests are executed and results are logged in bugzilla. | |
Build Performance | Try to at least maintain the current performance and improve if possible. | |
Package Update | Plan to have 70% or greater packages updated. | |
Patch Upstream Status | Less than 50% of all patches in Pending state. | |
Publication | The release is announced |
Milestone 2 - Target TBD
Release Criteria | Milestone 2 Target | Milestone 2 Status |
Functional Completion | All high features are completed. | |
Build and Release (Yocto) | All completed features can be built with no errors. | |
Build and Release (BSPs) | Core BSPs can be built with no errors. | |
Open Bugs | All bugs have been dispositioned. Milestone high issues have been fixed. | [2] |
Functional Tests | 100% of planned tests are executed and results are logged in bugzilla. | |
Distros Tested | Fedora, Ubuntu, Opensuse, Centos current version | |
BSP Testing | 100% of planned tests are executed and results are logged in bugzilla. | |
Build Performance | Try to at least maintain the current performance and improve if possible. | |
Package Update | Plan to have 70% or greater packages updated. | |
Patch Upstream Status | Less than 50% of all patches in Pending state. | |
Publication | The release is announced |
Milestone 3 - Target Sept. 7, 2018
Release Criteria | Milestone 3 Target | Milestone 3 Status |
Functional Completion | All high features are completed. | Done |
Build and Release (Yocto) | All completed features can be built with no errors. | Done |
Build and Release (BSPs) | Core BSPs can be built with no errors. | Done |
Open Bugs | All bugs have been dispositioned. Milestone high issues have been fixed. | [3] Done |
Functional Tests | 100% of planned tests are executed and results are logged in bugzilla. | Done - https://wiki.yoctoproject.org/wiki/WW41_-_2018-10-03_-_Full_Test_Cycle_2.7_M3_RC1 |
Distros Tested | Fedora, Ubuntu, Opensuse, Centos current version | Done - CentOs 7, Debian 9, Fedora 26, Fedora 27, OpenSuse 42.3, Ubuntu 16.04, Ubuntu 17.10 |
BSP Testing | 100% of planned tests are executed and results are logged in bugzilla. | Done - https://wiki.yoctoproject.org/wiki/WW41_-_2018-10-03_-_Full_Test_Cycle_2.7_M3_RC1 |
Build Performance | Try to at least maintain the current performance and improve if possible. | Done |
Package Update | Plan to have 70% or greater packages updated. | Not yet updated - http://recipes.yoctoproject.org/rrs/recipes/2.7/M3/ |
Patch Upstream Status | Less than 50% of all patches in Pending state. | Done - 44% |
Publication | The release is announced |
Milestone 4/Final - Target Oct. 26, 2018
Release Criteria | Milestone 4/Final Target | Milestone 4/Final Status |
Functional Completion | All high features are completed. | |
Build and Release (Yocto) | All completed features can be built with no errors. | |
Build and Release (BSPs) | Core BSPs can be built with no errors. | |
Open Bugs | All bugs have been dispositioned. Milestone high issues have been fixed. | [4] |
Bug Trend | Downward trend in bug tracking during the stabilization period. | |
Functional Tests | 100% of planned tests are executed and results are logged in bugzilla. | |
Distros Tested | Fedora, Ubuntu, Opensuse, Centos current version | |
BSP Testing | 100% of planned tests are executed and results are logged in bugzilla. | |
Documentation | All examples are tested to be functional. | |
Build Performance | Try to at least maintain the current performance and improve if possible. | |
Package Update | Plan to have 70% or greater packages updated. | |
Patch Upstream Status | Less than 50% of all patches in Pending state. | |
Wiki/Web Site Updated | Have reviewed the Wiki, Tutorials, and Website to insure all is current. | |
Publication | The release is announced |