Toaster testing plan: Difference between revisions

From Yocto Project
Jump to navigationJump to search
Line 18: Line 18:
= Team members =
= Team members =
= Scope =
= Scope =
Testing scope has been agreed upon as local installation only, using sqlite database on Fedora and Ubuntu operating systems on Firefox browser.
New features are to be tested as they are finished with test cases written for them once features are stabilized.
UI features being tested:
*Create new project
*Modify project settings and variables
*Add/Remove layers to project
*Building images
*Build details
*All builds report table
Backend features:
*Toaster installation and first time configuration
*Data presence
*Data consistency
*Build data
= Assumptions/Risks =
= Assumptions/Risks =
= Test Approach =
= Test Approach =

Revision as of 13:08, 4 December 2015

This article is the test plan for Toaster.

Objectives

Verify all Toaster components to be fully functional.

Components to be verified:

  • UI interface
  • Backend interaction with bitbake for build purposes
  • Backend interaction with database for storing and accessing build information


The testing objective involves only positive testing for existing features on Toaster. Perform exploratory testing focusing on newer features

  • this can sometimes generate new test cases.

Verifying the bugs and features.

Team members

Scope

Testing scope has been agreed upon as local installation only, using sqlite database on Fedora and Ubuntu operating systems on Firefox browser.

New features are to be tested as they are finished with test cases written for them once features are stabilized.

UI features being tested:

  • Create new project
  • Modify project settings and variables
  • Add/Remove layers to project
  • Building images
  • Build details
  • All builds report table

Backend features:

  • Toaster installation and first time configuration
  • Data presence
  • Data consistency
  • Build data

Assumptions/Risks

Test Approach

Overall approach to testing. Specify major activities, techniques and tools used to test groups of features

Regression Testing

Performance and stress testing

Test Automation

Test environment

Deliverables

Test schedule

Deliverables

  • Features to be tested

Resources roles & responsibilities

Release Criteria/ Exit Criteria

Dependencies

  • Personal Dependencies
  • Software Dependencies
  • Hardware Dependencies

Risks

Schedule

Technical

Requirements

Tools

Documentation