Web Hob design project with T&T: Difference between revisions
Line 15: | Line 15: | ||
[[#Final deliverables]] would be a set of static wireframes, a web-based prototype and a visual design framework. | [[#Final deliverables]] would be a set of static wireframes, a web-based prototype and a visual design framework. | ||
== Scope == | == Scope == |
Revision as of 15:25, 28 March 2013
This page contains information on the Web Hob design project we ran with the London-based agency Tobias & Tobias between January and March 2013.
General discussion about Web Hob happens on a dedicated mailing list: https://lists.yoctoproject.org/listinfo/webhob
Introduction
Web Hob is a web-based interface to the Yocto Project. The agency Tobias & Tobias were hired to start the interface design process, following a previous strategy engagement that established priorities and a high level plan for the Web Hob project.
The design work happened between January and March 2013 and was structured like this:
- 3 design iterations
- 2 rounds of user feedback
#Final deliverables would be a set of static wireframes, a web-based prototype and a visual design framework.
Scope
The strategy engagement identified 8 stages for the Web Hob project. The 3-month design work would cover the first 3 stages.
Stage 1
Create the first iteration of Web Hob, a read-only application that is limited to carrying out build metrics and forensics.
Stage 2
Implement the second core capability of Web Hob for the first time - the build specification and creation process. Along with build metrics this will undergo continuous improvement throughout Web Hob's lifetime. Also implement support for multi-user operation, supporting the Team Web Hob context.
Stage 3
Improve the two core capabilities, making them more powerful and more robust. At the end of this stage these core Web Hob features should be mature enough that it is ready to be deployed on publicly available infrastructure.
Scenarios included in stages 1 to 3
- Show Build Metrics
- Identify image
- Define scope of analysis
- Run analysis of image
- View analysis overview
- Finding / Viewing Builds
- View list of projects/builds
- Install Single-User Web Hob
- Check prerequisites
- Download/git clone Web Hob
- Install single-user option
- Create build
- Set up project
- Choose hardware
- Set preferences
- Specify layer(s)
- Specify base image and packages
- Run build
- Install Web Hob server
- Configure team servers
- Select team options and configure
- Error messaging
- View error logs
What we really covered
The project plan turned out to be over optimistic. Of the above scenarios, the 2 installation ones (Install single-user option and Install Web Hob server) were never covered.
Final deliverables
Wireframes: File:Final wireframes candidate v1.1.pdf
Visual design (Photoshop files)
Intermediate deliverables
Wireframes
- File:Wireframes-Stage 1-INT-002-0.10.pdf — Final Stage I Wireframes (bright blue links, buttons, etc. are clickable)
- File:Wireframes-Stage 2&3 review-INT-002-0.18.pdf — Interim wireframes incorporating Stage II & III feedback (bright blue links, buttons, etc. are clickable)
Static prototypes index
Sprint | Version | Stage | Scope | Link |
---|---|---|---|---|
1 | 1 | I,III | Build analysis | prototype |
2 | 1 | II,III | Projects and builds | prototype |
2 | 2 | II,III | Projects and builds | prototype |
2 | 3 | II,III | Projects and builds | prototype |
2 | 1 | II,III | File browsing and multi-user | prototype |
2 | 2 | I,II,III | File browsing and build analysis | prototype |
2 | 4 | I,II,III | All scenarios | prototype |
2 | 5 | I,II,III | All scenarios | prototype |
3 | 1 | I,II,III | All scenarios | [1] |
- Sprint is the design sprint (or phase) during which the prototype was produced. There are 2 design sprints in this project.
- Version indicates how many iterations of each prototype we created as part of the design process
- Stage refers to the Web Hob stages identified by Tobias & Tobias and outlined further down this page
- Scope indicates, at a high level, which scenarios are addressed by the prototype
- Link to the Yocto Project git repository where the prototype is hosted
Other
- File:Web Hob content structure.pdf — Web Hob information architecture
- File:Multiuser support in Web Hob.pdf - Design approach to multi user workflows in Web Hob
User feedback
- File:User Test 1 Findings-INT-002.pdf — Summary of feedback gathered on the Stage I designs
- File:User Test 2 Findings-INT-002.pdf - Summary of feedback gathered on Stage II designs
Visual design
Visual design work by Tobias & Tobias started at the beginning of March. They agreed to deliver a set of GUI components and 3 screen mockups:
- My activity dashboard
- Build dashboard
- Package information
The thumbnails below show the visual design work as it was delivered over time. I've grouped them by page, so that it's easier to see how they evolved.
Final versions were delivered on Friday, 22nd March 2013. This is the agency's final piece of work: it doesn't mean it will be the design we will implement. Changes might come based on community feedback.
My activity dashboard
Build dashboard
Package information
GUI controls
Previous work
- WebHob Design — Archived - Design and documentation for the first Web Hob project, now superseded by the above.
- Web UI 0.1: File:HOB WEB architecture overview v0 1.pdf (deprecated)