Web Hob design project with T&T: Difference between revisions

From Yocto Project
Jump to navigationJump to search
Line 6: Line 6:


== Design ==
== Design ==
=== Stage II & III ===
<br>
==== Scenarios Covered ====


=== Stage I ===
=== Stage I ===
* Create Build 
** Set up Project 
** Choose Hardware
** Set Preferences 
** Specify Layer(s)
** Specify base image and package(s)
** Run Build
* Install Web Hob Server
** Configure team servers 
** Select team options and configure
* Error Messaging 
** View error logs
* Refine scenarios from Stage I
====Schedule ====
* '''4 Feb 2013''' — Workshop
* '''8 Feb''' — 1st review
* '''12–14 Feb''' — User testing
* '''15 Feb''' — User testing review
* '''20 Feb''' — 2nd review
* '''22 Feb''' — Final review
<br>


==== Latest Files ====
==== Latest Files ====

Revision as of 16:00, 5 February 2013

This page contains information on the Web Hob project to develop a web-based UI for the Yocto project.

Mailing List: https://lists.yoctoproject.org/listinfo/webhob


Design

Stage II & III


Scenarios Covered

Stage I

  • Create Build 
    • Set up Project 
    • Choose Hardware
    • Set Preferences 
    • Specify Layer(s)
    • Specify base image and package(s)
    • Run Build
  • Install Web Hob Server
    • Configure team servers 
    • Select team options and configure
  • Error Messaging 
    • View error logs
  • Refine scenarios from Stage I


Schedule

  • 4 Feb 2013 — Workshop
  • 8 Feb — 1st review
  • 12–14 Feb — User testing
  • 15 Feb — User testing review
  • 20 Feb — 2nd review
  • 22 Feb — Final review


Latest Files


Scenarios Covered

  • Show Build Metrics (minimal)
    • Identify image (minimal)
    • Define scope of analysis (minimal)
    • Run analysis of image (minimal)
    • View analysis overview (minimal)
  • Finding/Viewing Builds (minimal)
    • View list of projects/builds (minimal)
  • Install Single-User Web Hob (minimal)
    • Check prerequisites (minimal)
    • Download/git clone Web Hob (minimal)
    • Install single-user option (minimal)


Schedule

  • 11 Jan 2013 — Kickoff
  • 14 Jan — Workshop
  • 18 Jan — 1st review
  • 22–24 Jan — User testing
  • 25 Jan — User testing review
  • 30 Jan — 2nd review
  • 1 Feb — Final review