Toaster testing plan: Difference between revisions
From Yocto Project
Jump to navigationJump to search
(→perf 2) |
(→perf 2) |
||
Line 77: | Line 77: | ||
| || || colspan="2" | Test execution cycle | | || || colspan="2" | Test execution cycle | ||
|- | |- | ||
| || || Weekly Test || Full Pass Test | | || || [[#Weekly Test]] || [[#Full Pass Test]] | ||
|- | |- | ||
| Build type || Weekly || Yes || Yes | | Build type || Weekly || Yes || Yes | ||
|- | |- | ||
| rowspan="2" | Build type || Backend || Yes || Yes | | rowspan="2" | Build type || [[#Backend]] || Yes || Yes | ||
|- | |||
| [[#Frontend]] || Yes || Yes | |||
|- | |||
| rowspan="4" | Target machine || qemuarm || Yes || Yes | |||
|- | |||
| qemumips|| || Yes | |||
|- | |||
| qemuppc|| || Yes | |||
|- | |||
| qemux86|| Yes || Yes | |||
|- | |||
| rowspan="3" | Target image|| core-image-minimal|| Yes || Yes | |||
|- | |||
| core-image-sato|| || Yes | |||
|- | |- | ||
Revision as of 07:44, 22 October 2013
Introduction
This article is the test plan for Toaster.
Objectives
The test process focuses on:
- validating the data collected from the build process
- verifying the correct functioning of the Toaster GUI.
Test Areas
Toaster consists of two big components, as follows:
1. Backend
Functionality tests
- REST API verification – create Django tests to detect API calls returning no data;
- Calculation of the data collection rate - the ratio of the number of the variables having null values and the total number of variables collected;
- Verify that all links in the simple UI are available;
- Verify the quality of the data collected through the simple UI;
Usability tests
- Verify the easy usage of Toaster (easy to install and stop/start the toaster server)
2. Frontend
Functionality tests
- Manual testing in the first stage;
- Automate testing using Selenium, in the second stage;
Compatibility tests
- Verify the behavior of the GUI on different browsers and operating systems;
Usability tests
- Verify if the GUI design is as described here: http://yoctoproject.org/webhob;
- Friendly graphical user interface;
Performance tests
- Stress testing (e.g. display appropriate error messages when the system is under stress);
perf 2
Test execution cycle | |||||
---|---|---|---|---|---|
#Weekly Test | #Full Pass Test | ||||
Build type | |||||
Weekly | yes | ||||
Build type | #Backend | yes | yes | ||
#Frontend | yes | ||||
Target machine | |||||
qemuarm | yes | yes | |||
qemumips | yes | ||||
qemuppc | yes | ||||
qemux86 | yes | yes |
Test execution cycle | |||
#Weekly Test | #Full Pass Test | ||
Build type | Weekly | Yes | Yes |
Build type | #Backend | Yes | Yes |
#Frontend | Yes | Yes | |
Target machine | qemuarm | Yes | Yes |
qemumips | Yes | ||
qemuppc | Yes | ||
qemux86 | Yes | Yes | |
Target image | core-image-minimal | Yes | Yes |
core-image-sato | Yes |