Yocto Project v1.0 Release Criteria: Difference between revisions
From Yocto Project
Jump to navigationJump to search
(added current status) |
|||
Line 15: | Line 15: | ||
|''M4 (Gold) criteria: All features in master can be built with no errors.'' | |''M4 (Gold) criteria: All features in master can be built with no errors.'' | ||
| bgcolor="yellow" | Builds are green for RC4 and RC5.<br> | | bgcolor="yellow" | Builds are green for RC4 and RC5.<br> | ||
RC4: DISTRO_VERSION isn't at 1.0. | RC4: DISTRO_VERSION isn't at 1.0.<br> | ||
RC5: DISTRO_VERSION is at 1.0. | RC5: DISTRO_VERSION is at 1.0. | ||
|- | |- | ||
Line 30: | Line 30: | ||
| ''M4 (Gold) criteria: 100% of planned tests are executed and results are logged in bugzilla'' | | ''M4 (Gold) criteria: 100% of planned tests are executed and results are logged in bugzilla'' | ||
| bgcolor="yellow" | | | bgcolor="yellow" | | ||
RC4: QA has completed test pass on RC4 except for stress testing. * | RC4: QA has completed test pass on RC4 except for stress testing. * <br> | ||
RC5: QA is working on a sanity test for RC5. | RC5: QA is working on a sanity test for RC5. | ||
|- | |- | ||
Line 36: | Line 36: | ||
| ''M4 (Gold) criteria: 100% of planned BSP tests are executed'' | | ''M4 (Gold) criteria: 100% of planned BSP tests are executed'' | ||
| bgcolor="#66FF33" | | | bgcolor="#66FF33" | | ||
RC4: QA has completed test pass on RC4 except for stress testing. * | RC4: QA has completed test pass on RC4 except for stress testing. * <br> | ||
RC5: QA is working on a sanity test for RC5. | RC5: QA is working on a sanity test for RC5. | ||
|- | |- |
Revision as of 20:13, 28 March 2011
Yocto v1.0 Release Criteria
Release Criteria | Target | Status |
---|---|---|
Functional Completion | M4 (Gold) Criteria: All M1, M2, M3 features and BSPs are in build. | see Yocto 1.0 Schedule#Stabilization Phase Features and Activities
All planned features are in build. |
Build and Release
(Yocto) |
M4 (Gold) criteria: All features in master can be built with no errors. | Builds are green for RC4 and RC5. RC4: DISTRO_VERSION isn't at 1.0. |
Build and Release
(BSPs) |
M4 (Gold) criteria: Core and meta-intel BSPs can be built with no errors. | Builds are green. |
Open Bugs | M4 (Gold) criteria: All bugs have been dispositioned. Critical/High bugs targeted for M4 have been fixed. | RC4 and RC5: All High priority bugs have been dispositioned. All High priority bugs for 1.0 are fixed. * |
Functional Tests | M4 (Gold) criteria: 100% of planned tests are executed and results are logged in bugzilla |
RC4: QA has completed test pass on RC4 except for stress testing. * |
BSP Testing | M4 (Gold) criteria: 100% of planned BSP tests are executed |
RC4: QA has completed test pass on RC4 except for stress testing. * |
Alpha Feedback | M4 (Gold) criteria: Alpha runs Feb 11th - Feb 23rd. Feedback is dispositioned. | Program completed. Issues have been dispositioned. |
Documentation | M4 (Gold) criteria: Release documentation created and published | Planned documentation deliverables are completed. See Yocto_1.0_Schedule#Documentation_Deliverables |
Build Performance | M4 (Gold) criteria: Build takes 90 minutes (stretch goal = one hour) to do a complete rebuild of local sources of poky-image-sato on a developer's desktop. (The one we are using is: Intel(R) Core(TM) i7 CPU 940 @ 2.93GHz, 8 siblings, 4 cpu cores, total mem 6118644k, with: MACHINE=qemux86, BB_NUMBER_THREADS = "8", PARALLEL_MAKE = "-j 6", and only rpm packaging.) | At 105 minutes. Team decision that this is not a blocker for 1.0. |
ADT User Workshop | M4 (Gold) criteria: ADT User Workshop is held where developers use ADT tools to demo software, and results are included. | Running into problems recruiting people, but not a blocker for 1.0 release. |
Upstream Commits | M4 (Gold) criteria: No goals for Yocto 1.0 - Yocto 1.1 will include more goals. | |
Marketing requirements from Engineering complete | M4 (Gold) criteria: Yocto demo is prepared for ELC. | Top issues: Need to fix bug 919 so that rygel works and audio/video can be played.- Josh had success with previous rygel version. |
Publication | M4 (Gold) criteria: Release and documentation are published on yoctoproject.org and Yocto 1.0 is announced | Release process beginning. See Yocto 1.0 Release Checklist for details. |
Tunnel Creek BSP Release Criteria
Release Criteria | Target | Status |
---|---|---|
Development progress | Features implemented; Code completed | Coding completed |
Build and Release | EMGD and non-EMGD BSPs build reliably | Build completed |
Open Bugs | All bugs dispositioned; Show-stoppers fixed | Only minor bugs found (724, 725) |
Functional Tests | 100% of planned tests executed | 100% testing complete |
Legal Compliance | All legal requirements met | Click-through completed |
Documentation | Release Notes created and published | Done |
Performance | Performance targets achieved | This will be done out of cycle. |
Publication | Release and documentation are published on yoctoproject.org | Done |
Laverne Point Release Criteria
Release Criteria | Target | Status |
---|---|---|
Development Progress | Coding complete | Coding completed |
Build and Release | Code builds reliably | Release candidate is built. |
Open Bugs | All bugs dispositioned; Show-stoppers fixed | No opens are show-stoppers. Open issues will be ID'd in release notes. |
Functional Tests | 100% of planned tests executed | testing completed |
Legal Compliance | All legal requirements met | tools run; requirements met |
Performance | Performance targets achieved | N/A |
Publication | Release and documentation are published on yoctoproject.org | Complete |