Yocto Project v1.2 Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
No edit summary
Line 59: Line 59:
= Project Dashboard =
= Project Dashboard =
[[File: feature-burndown12.png]]
[[File: feature-burndown12.png]]
<br/><br/>


= Yocto Project SWAT team =  
= Yocto Project SWAT team =  
Chairperson of the current week: Darren Hart (darren.hart@intel.com) <br/> <br/>
Chairperson of the current week: Darren Hart (darren.hart@intel.com) <br/> <br/>
Please see here for the details of the SWAT team: https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
Please see here for the details of the SWAT team: https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
<br/><br/>


= Yocto Project 1.2 Release Criteria =  
= Yocto Project 1.2 Release Criteria =  
Line 95: Line 98:
| Publication || Yocto 1.2, Milestone 1 release is announced || bgcolor="#39FF14" | Complete
| Publication || Yocto 1.2, Milestone 1 release is announced || bgcolor="#39FF14" | Complete
|}
|}
 
<br/><br/>
== Milestone 2 ==  
== Milestone 2 ==  
{| border="1" {{table}}
{| border="1" {{table}}

Revision as of 18:46, 12 January 2012

Yocto Project 1.2 release Status

Feature/Task Board

Scheduled Design Design Review Development Patch Review Testing Done Blocked
1277, M2, Shane, 9 1598, M2, Paul, 10 1634, M2, Bruce, 4 1582, M3, Joshua, 5 1555, M2, Lianhao, 2 1744, M2, Shane, 2 1461, M1, Beth, 0
1615, M3, Richard, 0 1543, M2, ScottG, 2 1621, M2, Dexuan, 2 822, M3, Joshua, 1 1655, M2, Xiaofeng, 1 1748, M2, Shane, 2 1580, M1, Jessica, 0
1581, M2, Shane, 3 1145, M2, ScottG, 2 1608, M2, Josh, 2 1590, M2, Wenzhong, 1 1805, M2, Jessica, 2 1627, M1, Beth, 0
1241, M2, Shane, 3 1656, M2, Kai, 1 1636, M3, Darren, 7 1630, M2, Tom, 1 1566, M2, Paul, 2 1564, M1, Dongxiao, 0
1763, M3, Saul, 0 1567, M1, Yi, 6 1589, M2, Liezhi, 1 1847, M2, Liming, 1 1644, M1, Bruce, 0
1584, M2, Jiajun, 2 1651, M2, Leizhi, 2 1126, M2, Lianhao, 1 1742, M1, Dongxiao, 0
1614, M3, Daren, 0 1643, M2, Bruce, 2 1556, M2, Lianhao, 1 1743, M1, Dongxiao, 0
1830, M3, Daren, 0 1764, M2, Belen, 2 1734, M2, Edwin, 1 1745, M1, Dongxiao, 0
1649, M3, Daren, 0 1809, M2, Belen, 2 1272, M2, Dongxiao, 1 1747, M1, Dongxiao, 0
1303, M2, Dongxiao, 3 1573, M3, Shane, 1 1572, M2, Dongxiao, 1 1732, M1, Dexuan, 0
1729, M2, Dongxiao, 3 1678, M2, Tom, 1 1750, M2, Dongxiao, 1 1660, M1, Tom, 0
1730, M2, Dongxiao, 3 1654, M2, Paul, 1 1752, M2, Dongxiao, 1 1661, M1, Tom, 0
1595, M2, Jiajun, 1 1775, M2, Dongxiao, 1 1751, M1, Shane, 0
1628, M2, Beth, 1 1787, M2, Dongxiao, 1 1565, M1, Paul, 0
1629, M2, Beth, 1 1792, M2, Dongxiao, 1 1546, M1, Beth, 0
1873, M2, Edwin, 1 1872, M2, Dongxiao, 1 1603, M1, Wenzhong, 0
1629, M2, Beth, 1 1638, M2, Bruce, 1 1568, M1, Jiajun, 0
1674, M1, Xiaofeng, 1 1776, M1, Beth, 0
1642, M2, Darren, 0
1647, M2, Daren, 0
1008, M1, ScottG, 0

Note: Each column lists "Feature #, Target Milestone, Owner, # of weeks in this stage".

Project Dashboard

Feature-burndown12.png



Yocto Project SWAT team

Chairperson of the current week: Darren Hart (darren.hart@intel.com)

Please see here for the details of the SWAT team: https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team

Yocto Project 1.2 Release Criteria

Milestone 1

Release Criteria Milestone 1 Target Milestone 1 Status
Functional Completion All P1 features are completed. Feature-burndown12-M1.png
See https://wiki.yoctoproject.org/wiki/Yocto_1.2_Schedule for details.
Build and Release (Yocto) All completed features can be built with no errors. Complete
Build and Release (BSPs) Core and meta-intel BSPs can be built with no errors. Complete
Open Bugs All bugs have been dispositioned. High issues have been fixed. [1] - new bugs for 1.2.
HIGH priority bugs - high bugs for 1.2
See trend chart at https://wiki.yoctoproject.org/wiki/Yocto_Bug_Trend.
Functional Tests 100% of planned tests are executed and results are logged in bugzilla. https://wiki.yoctoproject.org/wiki/Yocto_1.2_Milestone_Test_Report
Distros Tested Fedora, Ubuntu, Opensuse current version Fedora 15, Opensuse 11.4 and Ubuntu 11.04
BSP Testing 100% of planned tests are executed and results are logged in bugzilla. https://wiki.yoctoproject.org/wiki/Yocto_1.2_Milestone_Test_Report
Documentation Doc for windows user to deploy a Yocto BSP image on the hardware Complete
Build Performance Try to at least maintain the current performance and improve if possible. M1 improved performance.
Package Update 50% of the target 90%
Upstream Commits Have upstream status updated on 100% of patches (so that we can have a status update) Complete (a little below the target, will do better)
Marketing Deliverables None N/A
Publication Yocto 1.2, Milestone 1 release is announced Complete



Milestone 2

Release Criteria Milestone 2 Target Milestone 2 Status
Functional Completion All P1 features are completed. Feature-burndown12-M2.png
See https://wiki.yoctoproject.org/wiki/Yocto_1.2_Schedule for details.
Build and Release (Yocto) All completed features can be built with no errors.
Build and Release (BSPs) Core and meta-intel BSPs can be built with no errors.
Open Bugs All bugs have been dispositioned. High issues have been fixed. [2] - new bugs for 1.2.
HIGH priority bugs - high bugs for 1.2
See trend chart at https://wiki.yoctoproject.org/wiki/Yocto_Bug_Trend.
Functional Tests 100% of planned tests are executed and results are logged in bugzilla. https://wiki.yoctoproject.org/wiki/Yocto_1.2_Milestone_Test_Report
Distros Tested Fedora, Ubuntu, Opensuse current version
BSP Testing 100% of planned tests are executed and results are logged in bugzilla. https://wiki.yoctoproject.org/wiki/Yocto_1.2_Milestone_Test_Report
Documentation None
Build Performance Try to at least maintain the current performance and improve if possible.
Package Update about 70% of the target
Upstream Commits Have upstream status updated on 100% of patches (so that we can have a status update)
Marketing Deliverables None N/A
Publication Yocto 1.2, Milestone 1 release is announced