Yocto Project v1.0.1 Release Criteria: Difference between revisions

From Yocto Project
Jump to navigationJump to search
Line 32: Line 32:
| Build and Release (BSPs) || BSPs targeted for 1.0.1 (= all current BSPs) are built. || N/A - BSPs will not be built for 1.0.1.
| Build and Release (BSPs) || BSPs targeted for 1.0.1 (= all current BSPs) are built. || N/A - BSPs will not be built for 1.0.1.
|-
|-
| Open Bugs || All bugs targeted for 1.0.1 are in the build by May 13th. || bgcolor="red" | [http://bugzilla.yoctoproject.org/buglist.cgi?query_format=advanced&bug_status=NEW&bug_status=ACCEPTED&bug_status=REOPENED&bug_status=NEEDINFO&bug_status=WaitForUpstream&target_milestone=1.0%20PointRelease 1 bug] exists for 1.0.1 - not a show-stopper?<br>[http://bugzilla.pokylinux.org/show_bug.cgi?id=1029 bug 1029] exists for 1.0.1 - show-stopper?<br>[http://bugzilla.yoctoproject.org/buglist.cgi?query_format=advanced&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ACCEPTED&bug_status=REOPENED&bug_status=NEEDINFO&bug_status=WaitForUpstream&bug_status=RESOLVED&bug_status=VERIFIED&bug_status=CLOSED&target_milestone=1.0%20PointRelease 39 bugs total]
| Open Bugs || All bugs targeted for 1.0.1 are in the build by May 13th. || bgcolor="red" | [http://bugzilla.yoctoproject.org/buglist.cgi?query_format=advanced&bug_status=NEW&bug_status=ACCEPTED&bug_status=REOPENED&bug_status=NEEDINFO&bug_status=WaitForUpstream&target_milestone=1.0%20PointRelease 1 bug] exists for 1.0.1 - not a show-stopper?<br>[http://bugzilla.pokylinux.org/show_bug.cgi?id=1029 bug 1029] exists for 1.0.1 - If this is a regression from 1.0, then it needs to be fixed.  We will continue with a full QA test pass and meet on the 19th to discuss status.  If this issue is addressed, a full test pass may not need to be needed after fixing.<br>[http://bugzilla.yoctoproject.org/buglist.cgi?query_format=advanced&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ACCEPTED&bug_status=REOPENED&bug_status=NEEDINFO&bug_status=WaitForUpstream&bug_status=RESOLVED&bug_status=VERIFIED&bug_status=CLOSED&target_milestone=1.0%20PointRelease 39 bugs total]
|-
|-
| Functional Tests || 100% of planned tests are executed and results are logged in bugzilla. || bgcolor="orange" | Full test pass May 13-18.  Results posted for go/no-go on 19th.<br>Compliance tests will not be done for 1.0.1.<br>preliminary results available - bug 1029 exists in 1.0.1
| Functional Tests || 100% of planned tests are executed and results are logged in bugzilla. || bgcolor="orange" | Full test pass May 13-18.  Results posted for go/no-go on 19th.<br>Compliance tests will not be done for 1.0.1.<br>preliminary results available - bug 1029 exists in 1.0.1
|-
|-
| BSP Testing || 100% of planned tests are executed and results are logged in bugzilla. || N/A - BSPs will not be built for 1.0.1.
| BSP Testing || 100% of planned tests are executed and results are logged in bugzilla. || bgcolor="yellow" | BSPs need to be tested for 1.0.1.
|-
|-
| Documentation || 1.0.1 Release Notes are complete. || bgcolor="yellow" | Release notes to begin May 14th. Need text
| Documentation || 1.0.1 Release Notes are complete. || bgcolor="yellow" | Release notes will include high priority bugs fixed, pointer to bugzilla, security advisories.
|-
|-
| Build Performance || 1.0.1 does not increase performance above 107 minutes on a developer machine. || TBD
| Build Performance || 1.0.1 does not increase performance above 107 minutes on a developer machine. || bgcolor="yellow" | We have increased build time (~2 minutes) due to a fix, but this was a concsious decision by the team.
|-
|-
| Publication || 1.0.1 release is built and announced to the community. ||
| Publication || 1.0.1 release is built and announced to the community. ||
|}
|}

Revision as of 16:35, 17 May 2011

Yocto Project 1.0.1 Release Criteria

Yocto Project 1.0.1 is a point release from Yocto Project 1.0. In general, it contains critical bug fixes as well as nice to have items that are small, well-contained and provide a high benefit to include.

The criteria for adding a code submission into 1.0.1 are that the change:

  • Addresses a High priority issue. (Typically, these have critical or major severity.)
  • Is small and simple to evaluate (both in lines of code and complexity)
  • Fixes a specific problem which users are likely to encounter
  • Fixes that problem in a clearly defined way
  • Is self contained and unlikely to interact badly with other parts of the system
  • Fixes known/clear bugs

Good candidate changes are ones which:

  • Address usability issues
  • Address host specific issues, particularly in releases of distros that come out after our release
  • Address post release bugs users are hitting and reporting
  • Address security issues

Bad candidate changes include:

  • Significant changes of version (point release for security problems are acceptable)
  • Anything involves major code changes where changes cannot be reviewed individually or separated out
  • Adding new features
  • Changes that break the layout or compatibility with existing builds
  • Changes that would trigger significant rebuilds
Release Criteria Target Status
Functional Completion No new significant features are added. Any minor functionality added is documented in git logs. List of commits has been defined and reviewed and all bugs are in the release.
Build and Release (Yocto) 1.0.1 build can be built with no errors. Build was successful.
Build and Release (BSPs) BSPs targeted for 1.0.1 (= all current BSPs) are built. N/A - BSPs will not be built for 1.0.1.
Open Bugs All bugs targeted for 1.0.1 are in the build by May 13th. 1 bug exists for 1.0.1 - not a show-stopper?
bug 1029 exists for 1.0.1 - If this is a regression from 1.0, then it needs to be fixed. We will continue with a full QA test pass and meet on the 19th to discuss status. If this issue is addressed, a full test pass may not need to be needed after fixing.
39 bugs total
Functional Tests 100% of planned tests are executed and results are logged in bugzilla. Full test pass May 13-18. Results posted for go/no-go on 19th.
Compliance tests will not be done for 1.0.1.
preliminary results available - bug 1029 exists in 1.0.1
BSP Testing 100% of planned tests are executed and results are logged in bugzilla. BSPs need to be tested for 1.0.1.
Documentation 1.0.1 Release Notes are complete. Release notes will include high priority bugs fixed, pointer to bugzilla, security advisories.
Build Performance 1.0.1 does not increase performance above 107 minutes on a developer machine. We have increased build time (~2 minutes) due to a fix, but this was a concsious decision by the team.
Publication 1.0.1 release is built and announced to the community.