Weekly Status: Difference between revisions

From Yocto Project
Jump to navigationJump to search
Line 7: Line 7:
*SWAT lead is currently: Ross
*SWAT lead is currently: Ross
*SWAT team rotation: Ross -> Chen on Mar. 1, 2019
*SWAT team rotation: Ross -> Chen on Mar. 1, 2019
*SWAT team rotation: Chen -> Armin on Mar. 8, 2019
*SWAT team rotation: Chen -> Anuj on Mar. 8, 2019
*https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
*https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team



Revision as of 15:09, 4 March 2019

Yocto Project Weekly Status February 26, 2019

Current Dev Position: YP 2.7 M3
Next Deadline: YP 2.7 M3 Cutoff was Feb. 25, 2019

SWAT Team Rotation:

Key Status/Updates:

http://lists.openembedded.org/pipermail/openembedded-architecture/2019-February/001591.html

  • There were some serious usability issues found with multiconfig, those have been fixed in master and thud.
  • Various recipe upgrades made it in, thanks to all who contributed. Several recipes also converted to meson including glib-2.0 and gdk-pixbuf.
  • We now need to build M3 as we’re past feature freeze point for 2.7. Right now we’re aware of the following things which ideally need to be resolved first:
    • Bug 13178 “X server and matchbox desktop don't start up properly on beaglebone” needs to be fixed
    • Find the framebuffer problem with qemuarmv7 and switch to that
    • Several ptest issues would be addressed (missing openssl tests, 3 timeouts)
    • Arm build host issues identified and resolved
  • It’s unlikely we’ll switch to virtgl by default for 2.7 due to lack of testing from the community although the base patches for this have merged.

Planned Releases for YP 2.7:

  • YP 2.7 M2 rc2 is out of QA.
  • YP 2.7 M2 Release Target was Feb. 1, 2019
  • YP 2.7 M3 Cutoff is Feb. 25, 2019
  • YP 2.7 M3 Release Target is Mar. 8, 2019
  • YP 2.7 M4 Cutoff is Apr. 1, 2019
  • YP 2.7 M4 Release Target is Apr. 26, 2019

Planned upcoming dot releases:

  • YP 2.5.3 (Sumo) will be targeted after YP 2.7 M2 is done.
  • YP 2.5.4 (Sumo) will be targeted after YP 2.7 M4 is done.
  • YP 2.6.2 (Thud) will be targeted after YP 2.5.4 is done.

Tracking Metrics:

Key Status Links for YP:
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features

Archives