Web Hob design project with T&T: Difference between revisions

From Yocto Project
Jump to navigationJump to search
Line 13: Line 13:
* [[File:Wireframes-Stage_1-INT-002-0.6.pdf|Wireframes 0.7]]
* [[File:Wireframes-Stage_1-INT-002-0.6.pdf|Wireframes 0.7]]
* [http://git.yoctoproject.org/cgit/cgit.cgi/yocto-webhob-design/plain/phase1-iteration1-prototype/index.html Prototype 0.2]
* [http://git.yoctoproject.org/cgit/cgit.cgi/yocto-webhob-design/plain/phase1-iteration1-prototype/index.html Prototype 0.2]
* [[File:User_Test_1_Findings-INT-002.pdf‎ |User Test Findings, Round 1]]
* [[File:User_Test_1_Findings-INT-002.pdf‎|User Test Findings, Round 1]]


<br>
<br>

Revision as of 18:44, 25 January 2013

This page contains information on the Web Hob project to develop a web-based UI for the Yocto project.

Mailing List: https://lists.yoctoproject.org/listinfo/webhob


Design

Stage I

Latest Files


Scenarios Covered

  • Show Build Metrics (minimal)
    • Identify image (minimal)
    • Define scope of analysis (minimal)
    • Run analysis of image (minimal)
    • View analysis overview (minimal)
  • Finding/Viewing Builds (minimal)
    • View list of projects/builds (minimal)
  • Install Single-User Web Hob (minimal)
    • Check prerequisites (minimal)
    • Download/git clone Web Hob (minimal)
    • Install single-user option (minimal)


Schedule

  • 11 Jan 2013 — Kickoff
  • 14 Jan — Workshop
  • 18 Jan — 1st review
  • 22–24 Jan — User testing
  • 25 Jan — User testing review
  • 30 Jan — 2nd review
  • 1 Feb — Final review




Old Work