Planning

From Yocto Project
Revision as of 16:40, 14 March 2011 by Jnfleisc (talk | contribs) (added link to 1.1 Schedule)
Jump to navigationJump to search

Planning for features and schedule will be done in an open manner.


  • Yocto Features (v1.0) -- note, this was the process we used for collecting feature requests for 1.0. We'll do the same thing for the following release about 4 weeks before the 1.0 release.