Planning

From Yocto Project
(Difference between revisions)
Jump to: navigation, search
Line 1: Line 1:
Planning for features and schedule will be done in an open manner.
+
Planning for features and schedule will be done in an open manner. Watch this page for our 1.0 feature list as it develops.
 
+
Currently features and schedule are being planned for the Yocto Project 1.0. This page will contain links to features and schedules as these are developed.
+
  
 
For now, a feature request page for 1.0 is being populated.
 
For now, a feature request page for 1.0 is being populated.
  
 
* [[Yocto Features]]
 
* [[Yocto Features]]

Revision as of 13:09, 25 October 2010

Planning for features and schedule will be done in an open manner. Watch this page for our 1.0 feature list as it develops.

For now, a feature request page for 1.0 is being populated.

Personal tools