Line 207: Line 207:
| Build Performance || Try to at least maintain the current performance and improve if possible. || bgcolor="#39FF14"  | Done - https://wiki.yoctoproject.org/wiki/WW01_-_2019-01-02_-_Full_Test_Cycle_2.7_M1_RC1
| Build Performance || Try to at least maintain the current performance and improve if possible. || bgcolor="#39FF14"  | Done - https://wiki.yoctoproject.org/wiki/WW01_-_2019-01-02_-_Full_Test_Cycle_2.7_M1_RC1
|-
|-
| Package Update || Plan to have 70% or greater packages updated. || bgcolor="#39FF14"  | Done 80% - http://recipes.yoctoproject.org/rrs/recipes/2.6/All/
| Package Update || Plan to have 70% or greater packages updated. || bgcolor="#39FF14"  | Done 79% - http://recipes.yoctoproject.org/rrs/recipes/2.7/All/
|-
|-
| Patch Upstream Status || Less than 50% of all patches in Pending state. || bgcolor=""  |
| Patch Upstream Status || Less than 50% of all patches in Pending state. || bgcolor="#39FF14"  | Done - 44%
|-
|-
| Publication || The release is announced ||  bgcolor=""  |
| Publication || The release is announced ||  bgcolor=""  |

Revision as of 17:02, 3 January 2019

Yocto Project 2.7 release Status - Work in progress

Project Dashboard

https://wiki.yoctoproject.org/charts/combo.html

Feature/Task Board

Overview

Scheduled Design Design Complete Development Patch Review Testing Done Blocked
"None"
"None"
"None"
"None"
"None"
IDAssigneeMilestone
11583yeoh ee peng2.7 M1
12774Hongzhi2.7 M1
12332Michael Halstead2.7 M1
13058André Draszik2.7 M2
13094David Reyna2.7 M2
13110David Reyna2.7 M2
12931Joshua Watt2.7 M2
13030Joshua Watt2.7 M2
13088Aníbal Limón2.7 M2
12421Mingli Yu2.7 M2
13011Richard Purdie2.7 M2
13114Ross Burton2.7 M2
13012Apoorv2.7 M3
12654yeoh ee peng2.7 M3
12980Jon Mason2.7 M3
12981Jon Mason2.7 M3
11522Robert Yang2.7 M3
12650Mazliana2.7 M3
12651Mazliana2.7 M3
13013Richard Purdie2.7 M3
13014Richard Purdie2.7 M3
6077Changqing Li2.7 M4
8591Robert Yang2.7 M4
12548Scott Rifenbark2.7 M4
no bugzilla tickets were found
"None"

List View

Blocked

IDAssigneeEWhiteboardMilestoneStatus
  0   

Planned

IDAssigneePESummaryWhiteboardMilestoneStatus
   0    

Scheduled

IDAssigneePESummaryWhiteboardMilestoneStatus
   0    

Design

IDAssigneePESummaryWhiteboardMilestoneStatus
   0    

Design Complete

IDAssigneePESummaryWhiteboardMilestoneStatus
   0    

Development

IDAssigneePESummaryWhiteboardMilestoneStatus
   0    

Patch Review

IDAssigneePESummaryWhiteboardMilestoneStatus
   0    

Testing

IDAssigneePESummary (24 tasks) WhiteboardMilestoneStatus
11583yeoh ee pengMedium+4oeqa: core add support to publish results2.7 M1RESOLVED
12774HongzhiMedium+oeqa: kernel config depenency for some kernel test cases2.7 M1RESOLVED
12332Michael HalsteadMedium+2Regularly purge the error report database2.7 M1RESOLVED
13058André DraszikMedium+2split util-linux automatically instead of hard coding2.7 M2RESOLVED
13094David ReynaMedium3support custom extensions to reports2.7 M2RESOLVED
13110David ReynaMedium3Add "release" records to product records2.7 M2RESOLVED
12931Joshua WattMedium+5Change default PACKAGE_DEBUG_SPLIT_STYLE to "debug-with-srcpkg"2.7 M2RESOLVED
13030Joshua WattMedium+Add sstate hash equivalence support2.7 M2RESOLVED
13088Aníbal LimónMedium+0.3Add support for extracting individual ptest timing2.7 M2RESOLVED
12421Mingli YuMedium+Host-compiled Python bytecode not reproducible2.7 M2RESOLVED
13011Richard PurdieMedium+Start collecting ptest for arm and x86 on Vtargets.2.7 M2RESOLVED
13114Ross BurtonMedium+Split python3-ctypes tests package2.7 M2RESOLVED
13012ApoorvMedium+10Create/merge results aggregation and analysis tool2.7 M3RESOLVED
12654yeoh ee pengHigh10QA test results management to replace Testopia2.7 M3RESOLVED
12980Jon MasonMedium+5qemuarm rename to qemuarmv5 and change to v7 as default2.7 M3RESOLVED
12981Jon MasonMedium+5Switch qemuarm to qemu -m virt rather than versatilepb2.7 M3RESOLVED
11522Robert YangMedium+2runqemu env var QB_MEM expects to be set to "-m 256" not "256" or "256M"2.7 M3RESOLVED
12650MazlianaMedium+2Export manual test cases from Testopia to oeqa2.7 M3RESOLVED
12651MazlianaMedium+14Simple script to help manual test execution in populating test results into desired format2.7 M3RESOLVED
13013Richard PurdieMedium+Run results aggregation and analysis on the autobuilder2.7 M3RESOLVED
13014Richard PurdieMedium+Handle triggering and collection of build performance data for release builds2.7 M3RESOLVED
6077Changqing LiLow2piglit depends on libx112.7 M4RESOLVED
8591Robert YangMedium10bitbake world needs a lot of time for "Preparing RunQueue"2.7 M4RESOLVED
12548Scott RifenbarkMedium5Document variable assignment for DISTRO_FEATURES, IMAGE_FEATURES, SDKIMAGE_FEATURES, etc23 April 2019: RESOLVED2.7 M4RESOLVED
   84.3    

Done

IDAssigneePESummaryWhiteboardMilestoneStatus
   0    




Yocto Project v2.7 Release Criteria

Milestone 1 - Target Dec. 21, 2018

Release Criteria Milestone 1 Target Milestone 1 Status
Functional Completion All high features are completed. Done
Build and Release (Yocto) All completed features can be built with no errors. Done
Build and Release (BSPs) Core BSPs can be built with no errors. Done
Open Bugs All bugs have been dispositioned. Milestone high issues have been fixed. [1] The Triage Team is working to close all issues
Functional Tests 100% of planned tests are executed and results are logged in bugzilla. Done - https://wiki.yoctoproject.org/wiki/WW01_-_2019-01-02_-_Full_Test_Cycle_2.7_M1_RC1
Distros Tested Fedora, Ubuntu, Opensuse, Centos current version Done - CentOs 7, Debian 9, Fedora 26, Fedora 27, OpenSuse 42.3, Ubuntu 16.04, Ubuntu 17.10
BSP Testing 100% of planned tests are executed and results are logged in bugzilla. Done - https://wiki.yoctoproject.org/wiki/WW01_-_2019-01-02_-_Full_Test_Cycle_2.7_M1_RC1
Build Performance Try to at least maintain the current performance and improve if possible. Done - https://wiki.yoctoproject.org/wiki/WW01_-_2019-01-02_-_Full_Test_Cycle_2.7_M1_RC1
Package Update Plan to have 70% or greater packages updated. Done 79% - http://recipes.yoctoproject.org/rrs/recipes/2.7/All/
Patch Upstream Status Less than 50% of all patches in Pending state. Done - 44%
Publication The release is announced



Milestone 2 - Target Feb. 1, 2019

Release Criteria Milestone 2 Target Milestone 2 Status
Functional Completion All high features are completed.
Build and Release (Yocto) All completed features can be built with no errors.
Build and Release (BSPs) Core BSPs can be built with no errors.
Open Bugs All bugs have been dispositioned. Milestone high issues have been fixed. [2]
Functional Tests 100% of planned tests are executed and results are logged in bugzilla.
Distros Tested Fedora, Ubuntu, Opensuse, Centos current version
BSP Testing 100% of planned tests are executed and results are logged in bugzilla.
Build Performance Try to at least maintain the current performance and improve if possible.
Package Update Plan to have 70% or greater packages updated.
Patch Upstream Status Less than 50% of all patches in Pending state.
Publication The release is announced



Milestone 3 - Target Mar. 8, 2019

Release Criteria Milestone 3 Target Milestone 3 Status
Functional Completion All high features are completed.
Build and Release (Yocto) All completed features can be built with no errors.
Build and Release (BSPs) Core BSPs can be built with no errors.
Open Bugs All bugs have been dispositioned. Milestone high issues have been fixed. [3]
Functional Tests 100% of planned tests are executed and results are logged in bugzilla.
Distros Tested Fedora, Ubuntu, Opensuse, Centos current version
BSP Testing 100% of planned tests are executed and results are logged in bugzilla.
Build Performance Try to at least maintain the current performance and improve if possible.
Package Update Plan to have 70% or greater packages updated.
Patch Upstream Status Less than 50% of all patches in Pending state.
Publication The release is announced



Milestone 4/Final - Target Apr. 26, 2019

Release Criteria Milestone 4/Final Target Milestone 4/Final Status
Functional Completion All high features are completed.
Build and Release (Yocto) All completed features can be built with no errors.
Build and Release (BSPs) Core BSPs can be built with no errors.
Open Bugs All bugs have been dispositioned. Milestone high issues have been fixed. [4]
Bug Trend Downward trend in bug tracking during the stabilization period.
Functional Tests 100% of planned tests are executed and results are logged in bugzilla.
Distros Tested Fedora, Ubuntu, Opensuse, Centos current version
BSP Testing 100% of planned tests are executed and results are logged in bugzilla.
Documentation All examples are tested to be functional.
Build Performance Try to at least maintain the current performance and improve if possible.
Package Update Plan to have 70% or greater packages updated.
Patch Upstream Status Less than 50% of all patches in Pending state.
Wiki/Web Site Updated Have reviewed the Wiki, Tutorials, and Website to insure all is current.
Publication The release is announced